Attachments, pictures, and links in this message have been blocked for your safety. Show content
From Glen David Wilson: Please distribute the enclosed to Neighborhood Asssociation members and others: Attend Street Committee meeting: See information and schedule below
From: Glen David Wilson (technical@cox.net)
Save North Garland Avenue and West Mount Comfort Road
EMERGENCY NEWS
5 LANE Highway Threatens substantial damage to households and businesses on .75 Mile Section of North Garland and on West Mount Comfort Road
(Use Page Down for the following pages)
· Page 4: How did North Garland get into this “Widening” Problem?
Look for your house and or business on the diagrams excerpted from AHTD Preliminary Construction Plans, Attachment 2.
· Page 5: But Now in 2008, everything has Changed
· Page 6: Why is North Garland Being Widened?
· Page 7: A better method of providing fast access to the University
· Page 7: How many more lanes should North Garland have to promote fast traffic access to the University?
· Page 7: Design Your Own Version of A North Garland Profile(cross-section)
· Page 8: Other North Garland Improvements?
· Page 9: Arkansas State Highway and Transportation Department Preliminary Construction plans for the proposed North Garland
· Page 9: The City/State Proposed Relocation of West Mount Comfort Road: Map in Attachment 1
· Page 10: An Important Decision is Where to Relocate the Intersection of West Mount Comfort Road with North Garland
· Page 11: Wild speculations about the future of the North Garland Area
· Page 11: My conclusions
· Pages 12: What can you do to stop the damage to North Garland and the dangers of the proposed reconfiguration of West Mount Comfort
· Page 15: Email and call list attached!
A Call to Action
Reference: Arkansas Highway and Traffic Department (AHTD) Job Number 040489--Highway 112 Spur—North (Fayetteville)
How did North Garland get into this “widening” Problem?
Back in 2006 when the economy was better, and gasoline prices were lower, the Fayetteville City Council determined that there was a critical need for an additional source of revenue to finance wastewater facilities and Street and Trail improvements within the city.
The City Council acted out of a need for additional bond sources for completion of the Waste Water System Improvement Program and also based upon community-wide Citizen Surveys of 2004 and 2005. During an 18 month period the City Council/Street Committee discussions on major street improvement evolved into a 3 Phase program. “Phase 1 was proposed to be a 6-year $62,000,000 program, providing traffic capacity and safety improvements and economic development opportunities to those corridors with the most need. Later Phases, through additional bond elections, will address additional safety, capacity, and economic development needs. The resources required for the initial phase of the Transportation Improvement Program is $62,000,000 plus bond and debt placement and surety costs.” Paraphrasing in this paragraph and quotation are from the City Operations Director’s letter to the City Council dated June7, 2006. See Appendix 6 for a list of the Phase 1 projects and estimated costs as of June 7, 2006. Project Number five is the North Garland project.
To obtain this revenue, the City Council passed Ordinance 4891 on June 20, 2006. Ordinance 4891 authorized a special election on September 12, 2006. Four Questions were put to qualified Fayetteville voters for a decision. See Appendix 1: Excerpt from Fayetteville’s Ordinance 4891, Pages 4 through 6.
Bonds for each Question are secured by a pledge of and lien upon (i) all of the receipts of the .25% Sales and Use Tax and (ii) all of the receipts of a renewed .75% Sales and Use Tax, each levied pursuant to the Local Government Bond Act.
Each Question refers to an individual Bond Name:
· Question One: “Wastewater Improvement Bonds”
· Question Two: “Wastewater Improvement/Refunding Bonds”
· Question Three: “Street Improvement Bonds”
· Question Four: “Trail Improvement Bonds"
The Special Election result was YES for all of the above Questions. See Appendix 1 for the Special Election Ballot Questions and other information excerpted from Ordinance 4891.
North Garland was selected by the City Council/Street Committee from a list of Transportation Improvement Projects for “Widening-5 Lane Principal Arterial”. The North Garland estimated cost from the “City of Fayetteville, Transportation Improvement Plan” is $6,695,000.
The bonds issued following the Special Election were issued with an assumed annual growth rate of the City’s Sales Tax Revenue of 4% as shown at the end of Appendix 1, Finance Plan: Wastewater System and Transportation Plan, note Assumption 1. Would this be a valid assumption in a recession or an economy slowdown condition?
And that ends the explanation of how North Garland got into this “widening” problem.
But now in 2008, everything has changed. Some say the economy is in recession.
According to the City of Fayetteville Press Release of July 25, 2008 referring to Mayor Coody: “He also called attention to the declining federal funds available to assist cities and counties across the country with major infrastructure projects and the fact that current estimates to simply maintain the current condition of our public infrastructure exceed existing revenue streams at all levels of government.” Bold print emphasis provided by the author.
The City has a hiring freeze at the time of this writing. This is an indication of uncertainty about tax revenue and a declining economy. Apparently the City can finance and build street improvement projects but will the funds be there for maintaining these projects and other infrastructure?
Would it be in the city’s best interest to:
· allocate the $6,695,000 2006 budgeted funds to a more pressing City need, and defer the North Garland widening project until there is unity within the North Garland community?
· delay the North Garland widening project until the City is more certain that there will be sufficient tax revenue for bond payments and infrastructure maintenance?
Why is North Garland being Widened?
It is my understanding from an Alderman on the Street Committee that the purpose of the North Garland widening is to provide increased traffic access to the University. Can widening North Garland do this?
Three streets feed the northern entrance to the University (South Garland):
1. North Street: Traffic from the East including College Avenue and all connecting streets
2. Wedington Drive: traffic from the West, Highway 540 and all connecting streets
3. North Garland: traffic from the North, Highway 540 and all connecting streets
The intersection of these streets forms a plus sign (+) with North Street on the right side of the plus , Wedington Drive on the left side, North Garland on the Top, and South Garland at the bottom. The direction North is at the top of the plus sign.
The three feeder streets have a traffic capability of about 3 times (a 3 to 1 ratio) or more the traffic capability of South Garland (the key northern University entrance). Vehicles bound for the University/stadium in heavy traffic must wait their turn to get into the University entrance on South Garland. Thus, all three feeder streets become stacking areas for vehicles waiting to get into the University entrance: all three feeder streets become temporary parking lots.
Widening North Garland makes the 3 to 1 ratio worse: it simply adds more stacking area for vehicles waiting to get into the Northern entrance of the University (via South Garland). Widening North Garland means that those drivers on Wedington and on North Street will have to wait longer to get into the narrow northern entrance to the University.
Additional stacked traffic on the proposed 5 lane, widened North Garland will mean more traffic problems because of vehicles on each feeder street whose drivers are seeking to quickly get into the northern entrance to the University.
A widened North Garland will make the situation more adverse and more dangerous for moving traffic into the northern entrance to the University.
A Better Method of Providing Fast Access to the University:
A more efficient method of stacking traffic would be to park vehicles in a holding area West of Highway 540 and run busses to/from the University.
Per the City, there are no plans to widen the section of Garland South of North Street, that is, South Garland or the northern University entrance in the author’s terms. The South Garland section was completed about 2005 by the Arkansas Highway and Transportation Department. South Garland section was widened to two lanes into, two lanes out of the University, with a turning lane at major intersections.
How many more lanes should North Garland have to promote fast traffic access to the University?
A resounding ZERO is the answer. We could ask the Street Committee and the City Council to leave North Garland just as it is!
Design Your Own Version of A North Garland Profile (cross-section)
There are four possibilities for a North Garland roadway profile:
1) Leave North Garland just as it is: two lanes
2) Center Turning Lane +2 regular lanes
3) Four regular lanes
4) Center Turning lane + 4 regular lanes (as shown in Attachment 2, page 2)
Each of these possibilities can be constructed with sidewalks and or bike paths and green space/BERM on one or both sides. Profiles can have barricades/green space in the turning lane or separating lanes in each direction. It is doubtful if barricades/green space can be used on North Garland because they use excessive amounts of roadway.
Typical measurements across:
· Lanes are about 11 feet
· Turning lane about 12 feet
· Sidewalks are about 5 feet to 10 feet
· Bike paths are from about 3 feet to 5 feet
· Green space/BERM from about 3 to 9 feet
· Curbing about 1 to 2 feet
The sides of your own proposed North Garland profile don’t have to be symmetrical.
For example:
· On the East side of AHTD’s proposed design the Berm is 3 feet and the sidewalk is 5 feet.
· On the West side of AHTD’s proposed design, the Bern is 6 feet and the shared path is 10 feet.
Another bit of information, bikers are reported to prefer their bike paths on the street and they want to face the oncoming traffic for safety reasons.
A turning lane could have painted designations on the roadway where left turns are allowed. Some turning lanes have barriers designating where left turns are allowed.
With the above information you can design your own proposed North Garland Avenue Profile.
Example Profile: A two lane highway with five foot sidewalks, 3 foot Berms, 5 foot bicycle paths in each direction, and 2 foot curbs would be 52 feet wide.the calculation for this profile from left to right is 5+3+2+5+11+11+5+2+3+5=52. If the bicycle paths were only 3 feet wide, the total profile width would be 48 feet.
To see the effect of a 52 foot North Garland Profile on local residences and businesses, we would need to draw our example 2 lane highway on a detailed map of North Garland. We shall ask the City to assist us with this and other candidate profiles as requested in “My Conclusions” at the end of this Call to Action.
Other North Garland Improvements?
Would we like to improve North Garland? We could have a three lane highway with specifically marked spots for turning from the center lane. Any 3 lane plan would have to be acceptable to the owners of residences and business of North Garland.
A turning lane with designated turning areas would enhance the flow of North Garland traffic because vehicles would be less likely to stop on the right-most roadway while waiting to turn left.
The already expanded 4 lane section of North Garland near the North Street/Garland intersection should not be expanded further except for sidewalks some of which already exist, and possibly on street bicycle paths depending on the street design and the nearby business land availability (if any).
If a three lane highway were implemented instead of a five lane highway, there could possibly be enough savings to extend the three lane highway north to Highway 540: this could provide benefits for the local North Garland area residents and businesses.
Adding more than 2 lanes and sidewalks/bike paths means that residents and businesses along North Garland would suffer even more losses and grief/anger at having been harmed by the City.
Arkansas State Highway and Transportation Department’s Preliminary Construction Plans for North Garland
The Arkansas State Highway and Transportation Department’s preliminary construction plans for “Hwy. 112 Spur-North” (See Attachment 2) show that the 5 lane highway will run very close to some commercial and residential buildings, eliminate any on street parking, and require a change to the present Garland Street store entrance.
The City/State proposed 5 lane highway through residential and commercial North Garland will damage both commercial and residential property. Slices of property that the City/State has proposed to take from each residence could leave some residences so close to the 5 lane highway that the houses will be persistently uncomfortable living spaces because of the highway noise.
The same is true for some of the commercial buildings on North Garland. It is possible that a 5 lane highway through North Garland would destroy the utility of some commercial buildings due to noise and other 5 lane highway deleterious effects. The owners would not necessarily be compensated if the house/commercial buildings were not legally taken or condemned.
The City/State Proposed Relocation and Reconfiguration of West Mount Comfort
As a part of the North Garland widening, the City/State has chosen to reconfigure and relocate West Mount Comfort: the current West Mount Comfort is the angled road which intersects North Garland just North of the Harps grocery store.
· The proposed relocated/reconfigured West Mount Comfort has been put into the very busy/congested area of North Garland which has many entrances/exits: See map in Attachment 1: Proposed West Mount Comfort.
· The proposed configuration for West Mount Comfort travels over the front yard of 1107 James Street, makes a 90 degree turn across the commercial development lot just North of the grocery store, before making an intersection with North Garland.
· The entrance of the proposed reconfigured West Mount Comfort is about 150 feet wide which is about twice the entrance width of the East section of Mount Comfort (on the East side of North Garland and South about 240 feet).
The combination of this proposed West Mount Comfort/North Garland intersection and the proposed widening of North Garland will eliminate at least 22 parking spaces from the grocery store, producing traffic congestion within the remaining grocery store parking area and making it more difficult for vehicles and bicycles to enter and exit the remaining grocery store parking area. These changes will make it more difficult for the grocery store to turn a profit and continue paying taxes to the City at the same volume of business as now.
Harps grocery store, is the “anchor” property and largest business in the North Garland area: Grocery store parking is important to the shopping public, students and residents in the entire North Garland area.
When I made my “North Garland” presentation of the above and more to the Ward 2 meeting July 8, 2008, I demonstrated, using a large overlay aerial chart, how dangerous the proposed West Mount Comfort intersection with North Garland is for pedestrians, bicycles and vehicles. Motorcycles are included in the vehicle category herein.
I received good support from those assembled: most had already decided for themselves that the 5 lane North Garland Widening program didn't make sense. The North Garland Widening program will take the front yards (and more) of many of the local North Garland residents. It will damage businesses and reduce tax revenue to the City.
I would like to make this same presentation at the Street Committee Meeting on August 18, 2008 in City Hall room 326.
An Important Decision is Where to Relocate the Intersection of West Mount Comfort Road with North Garland.
The location proposed by the City/State routes West Mount Comfort traffic into the “most challenging” and busy section of North Garland and is dangerous to vehicles, pedestrians, and bicycles.
· See the map in Attachment 1: “Proposed West Mount Comfort”.
· See Appendix Number 2: “The proposed West Mount Comfort Relocation” for a discussion of these dangers.
· See Appendix 3: “A Vision for the Commercial Development Lot”.
· See Appendix 4: “Proposed West Mount Comfort to Overrun 1107 James Street Front Yard”.
Wild Speculations about the Future of the North Garland Area:
See Appendix 5 for Wild Speculations about the future of the North Garland Area. In appendix 5 I am trying to understand the present proposals by the City/State by speculating about the future. If we can understand what might happen in the future, we could have a chance to make choices and changes for the better now.
My Conclusions:
1) Ask the City/State to study and diagram the following North Garland options:
· Option 1: Don’t do anything to North Garland; reallocate the budgeted funds for other City projects. Minimal cosmetic improvements might be acceptable and can be suggested/diagrammed by the City /State.
· Option 2: 2 lanes + sidewalks + bike path(s) on the street
· Option 3: Turning lane + 2 lanes + sidewalks + bike path(s)
· Option 4: Consider/diagram/cost extending any North Garland improvements North to Highway 540.
Requested Guidelines to the City/State: Minimize damage to residential and commercial property.
All options and alternatives shall subject to review, revision and approval/disapproval by the North Garland community at one or more “involvement meetings”. Provide a written rationale for your preliminary designs.
2) Totally reject the proposed West Mount Comfort location and configuration
It is dangerous to vehicles, pedestrians and bicycles and increases congestion in the already busy and congested area of area of North Garland which is within the range of about 500 feet of the Garland/North Street intersection.
Ask the City to provide three alternative locations and configurations for West Mount Comfort.
Requested Guidelines to the City/State: Minimize damage to residential and commercial property and minimize the impact of West Mount Comfort traffic in the busy and congested area of North Garland which is within the range of about 500 feet of the Garland/North Street intersection.
All options and alternatives shall subject to review, revision and approval/disapproval by the North Garland community at one or more “involvement meetings”. Provide a written rationale for your preliminary designs.
3) Delay the entire North Garland Widening project until there is unity and agreement of the North Garland community.
4) Request the City/State to establish specific personal methods including email and or regular mail for communications to each individual property owner of the North Garland community so that City’s councils and committees and or State discussions of their property will be made known to them in a timely manner. Timely manner herein means at least 10 days before the next meeting of the City council or committee within which the property discussion occurred. Group meetings shall not be a substitute for these timely notifications.
What can you do to stop the damage to North Garland and the dangers of the proposed reconfiguration of West Mount Comfort?
Go to the Street Committee Meeting: Monday, August 18, 4:30 PM
in City Hall Room 326
We have a chance to save North Garland and choose a safer area for the relocation of the Proposed West Mount Comfort’s intersection with North Garland.
……….But only if we Express our opinions………..
The Monday, August 18, 2008 Street Committee meeting in Room 326 will be your opportunity to voice your concerns about the North Garland widening and the dangerous proposed relocation of the North Garland/West Mount Comfort intersection. Your attendance and your neighbor’s attendance could make the difference!
Expect that attendees will be allowed to make comments when the Committee Chairman acknowledges your raised hand after some discussion within the Committee.
My view is: We don’t know when a final decision about North Garland will be made or if this is the last meeting where we can express our opinions: We should direct our energy toward this meeting and the attached Call/Email List! Let’s stop/revise this 5 lane Bulldozer now!
Your opinion Counts!
Let’s Make a Determined All-Out Effort to Stop the 5 Lane Highway Implementation on North Garland!
Look on accessfayetteville.com for announcements of City Council and Street Committee meetings or Call the City Clerk’s office for the date and time of these meetings. See the City Clerk’s contact information is in the Addendum after the end of the Email/Call list.
Go to the August 18, 2008 and later Street Committee Meetings.
Go to the City Council meetings.
Together we can make a difference! We must Act now!
Now: Spread the News!
1) Contact three people and enlist their support: ask them each to contact three more people and continue this expansion process …..provide each contact with a copy of “Save North Garland Avenue and West Mount Comfort Road” or at least the Call/Email List. Email forwarding works well for this.
2) Use the attached list for the City of Fayetteville and for the State of Arkansas : do some or all of the following:
These First:
1) Telephone all of those on the attached list
2) Email all of those on the attached list,
Time for more? Then do these next:
1) Send a letter,
2) Send a telegram
3) Send personal representatives to visit with members of the attached list, or go and visit with those officials who will determine North Garland’s future yourself.
Monday, August 18, 4:30 PM in City Hall Room 326
Let’s all be at the Street Committee Meeting and Save North Garland Avenue and West Mount Comfort Road!
I have done my best to let you know about the North Garland/West Mount Comfort situation as I know it. I hope to have provided a service to the North Garland community and to the city of Fayetteville.
Regards,
Glen Wilson
Email:technical@cox.net
Property Owner: West Mount Comfort/Garland
The author authorizes others to make unlimited copies of this document.
See attached Addendum for Names, telephone numbers,
and email addresses of
· Mayor/City Council/Street Committee
· Fayetteville persons who have picked-up 2008 election candidate information from the City Clerk’s office
· State of Arkansas Governor/State Senator/State Representative
· United States Senators for Arkansas
· United States House of Representatives: Congressman
· Arkansas Highway and Transportation Department (AHTD)
Addendum
I appreciate the service and dedication of the Mayor, the City Council, the Planning Commission and the Street Committee. I appreciate the Street Committee’s current review of the widening of the .75 mile of North Garland.
I share the enormous pervasive concerns of the local North Garland population.
Call/Email List for Fayetteville:
From the Fayetteville City Clerk’s Office
Mayor: Dan Coody
1418 E. Rodgers Drive
Fayetteville, AR 72701
443-6758
dcoody@ci.fayetteville.ar.us
Term End Date 12/31/2008
Alderman Positions:
WARD 1:
WARD 1:
Position 1
Position 2
Adella Gray
Brenda Thiel
1681 N Starr Drive
172 E. Willoughby Drive 72701
Fayetteville, AR 72701
Fayetteville, AR 72701
442-4958 (H) 841-5266 (Cell)
442-3095
Ward1_pos1@ci.fayetteville.ar.us
Ward1_pos2@ci.fayetteville.ar.us
Term End Date 12/31/2010
Term End Date 12/31/2008
WARD 2:
WARD 2:
Position 1
Position 2
Kyle B. Cook
Nancy Gordon Allen
1335 Vanderventer
PO Box 3105
Fayetteville, AR 72703
Fayetteville, AR 72702
521-7632
442-5536
Ward2_pos1@ci.fayetteville.ar.us
Ward2_pos2@ci.fayetteville.ar.us
Term End Date 12/31/2010
Term End Date 12/31/2008
WARD 3:
WARD 3:
Position 1
Position 2
Robert K. Rhoads
Robert Ferrell
Arvest Plaza
2413 Twin Oaks Court
75 N. East Ave Suite 402
Fayetteville, AR 72703
Fayetteville, AR 72701
442-3535
973-5202
Ward3_pos2@ci.fayetteville.ar.us
Ward3_pos1@ci.fayetteville.ar.us
Term End Date 12/31/2008
Term End Date 12/31/2010
WARD 4:
WARD 4:
Position 1
Position 2
Shirley Lucas
Lioneld Jordan
2139 Ora Drive
1600 Arrowhead
Fayetteville, AR 72701
Fayetteville, AR 72701
442-4612
442-5415
Ward4_pos1@ci.fayetteville.ar.us
Ward4_pos2@ci.fayetteville.ar.us
Term End Date 12/31/2010
Term End Date 12/31/2008
Fayetteville 2008 General Election Candidates:
The filing period to run for Municipal office is August 6, 2008 through 12:00 noon on August 26, 2008.
Thus, it was not possible to include the list of those who have actually filed as candidates.
The following is a list of people who have picked-up candidate-filing information from the City Clerk’s office.
The problem with this list is that the following list contains only names of people who have picked-up the filing information and that person may not actually be the candidate.
An updated list will probably be available from the City Clerk’s office or better still request a list of those candidates who have filled as candidates after August 6, 2008.
State of Arkansas Email/Telephone List
Arkansas Governor
· Mike Beebe
State Capitol, Room 250
Little Rock, Arkansas 72201
501-682-2345
GovernChief of Staff: 501-682-3607
Email Governor Beebe by completing the form on web page: http://governor.arkansas.gov/contact/index.php
Arkansas State Senator:
· Sue Madison
573 Rock Cliff Road
Fayetteville, Arkansas 72764
479-442-2997
madisons@arkleg.state.ar.us
Arkansas State Representative:
· Marilyn Edwards
2330 North Juneway Terrace
Fayetteville, Arkansas 72703
479-442-8388
edwards@arkleg.state.ar.us
Unites States House of Representatives:
· John Bozeman
-member of the Transportation and Infrastructure Committee
-Stacey Mattingly, Constituent Services, Intern Coordinator and District Office Manager
Lowell Office:
213 W. Monroe, Suite K
Lowell, AR 72745
Phone: (479) 725-0400
Fax: (479) 725-0408
Email Congressman John Boozman by filling in the form on web page
https://forms.house.gov/wyr/welcome.shtml
United States Senate:
· Blanche Lincoln
4 South College Avenue, Suite 205
Fayetteville, AR 72701
(479) 251-1224; FAX (479) 251-1410
Community Affairs Specialist: John Hicks
Email Senator Blanch Lincoln by using the Form on web page: http://lincoln.senate.gov/webform.html
· Mark Pryor
Little Rock Office
The River Market
500 Clinton Ave
Suite 401
Little Rock, AR 72201
Phone: (501) 324-6336
Fax: (501) 324-5320
Toll Free from AR:
(877) 259-9602
Email Senator Mark Prior by completing the form on web page:
http://pryor.senate.gov/contact/
Arkansas Highway Commission
· Jonathan D Barnett
Commissioner
1980 Highway 412 West
West Siloam Springs, Arkansas 72761
(479) 524-6269
(479) 524-9440
Arkansas Highway and Traffic Department
· Dan Flowers
Director
Arkansas Highway and Transportation Department
10324 Interstate 30
Little Rock, AR 72209
501-569-2211
· Lynn Malbrough
Arkansas Highway and Transportation Department
Division Head for Environmental
10324 Interstate 30
Little Rock, AR 72764
501-569-2281
Lynn.malbrough@arkansashighways.com
---------------------------------------End Email/Call List----------------------------------------------------------------
If you have questions about the Street Committee meeting or other meetings: Look on accessfayetteville.com for announcements of City Council and Street Committee meetings or Email/Call the City Clerk’s office for the date and time of these meetings.
City Clerk
City Administration Bldg
113 W Mountain St
Room 308
Fayetteville, AR 72701
Tel: (479) 575-8323
Fax: (479) 718-7695
Email: city_clerk@ci.fayetteville.ar.us
List of Appendices that follow:
· Appendix 1: Excerpt from Fayetteville’s Ordinance 4891, Pages 4 through 6 and the Finance Plan Slide
· Appendix Number 2: The proposed West Mount Comfort Relocation
· Appendix 3: A Vision for the Commercial Development Lot
· Appendix 4: Proposed West Mount Comfort to Overrun 1107 James Street Front Yard (like many of the yards on North Garland)
· Appendix 5: Wild Speculations about the future of the North Garland Area
· Appendix 6: Fayetteville Transportation Improvement Program, Phase 1
List of Attached Maps that follow: North is at the top of the Attachment 1 map
· Attachment 1: Proposed West Mount Comfort
· Attachment 2: Highway 112 Spur-North, Excerpt of the Preliminary Construction Plans from the Arkansas Highway and Transportation Department (you may need a magnifying glass for this one)
Appendix 1: Excerpt from Fayetteville’s Ordinance 4891,
Pages 4 through 6
the "Sales and Use Tax"). The Sales and Use Tax shall be levied and collected only on the first $2,500 of each "single transaction" (as defined in Section 9 hereof). The levy and collection of the 0.25% Sales and Use Tax shall commence on and as of such date as provided in the Local Government Bond Act, and shall cease upon retirement in full of the Bonds. The levy and collection of the 0.75% Sales and Use Tax shall commence on the day following the date of expiration of the Prior Tax, and shall cease upon retirement in full of the Bonds. Any collections of the Prior Tax received after its expiration shall be used, if necessary or appropriate, to provide for the payment of debt service on the Bonds. Revenues resulting from the collection of the Sales and Use Tax shall be utilized solely for the payment of debt service on the Bonds.
Section 2. That under the authority of Amendment 62 and the Local Government Bond Act and subject to approval by the electors of the City as provided in Section 3 below, there is hereby authorized (1) the issuance of the City's capital improvement bonds in the aggregate principal amount of not to exceed $25,000,000 for the purpose of financing all or a portion of the costs of acquisition, construction, reconstruction, extension and equipping of certain improvements to the City's wastewater treatment plants, sewerage and related facilities, including right-of-way acquisition, (2) the issuance of the City's capital improvement bonds in the aggregate principal amount of not to exceed $17,000,000 for the purpose of directly financing all or a portion of the costs of acquisition, construction, reconstruction, extension and equipping of certain improvements to the City's wastewater treatment plants, sewerage and related facilities, including right-of-way acquisition, or, alternatively, for the purpose of refunding water and wastewater revenue bonds originally issued to finance said improvements, (3) the issuance of the City's capital improvement bonds in the aggregate principal amount of not to exceed $65,900,000 for the purpose of financing all or a portion of the costs of acquisition, construction, reconstruction, repair, straightening and widening of certain City streets, which may include related sidewalk, traffic signal and control, curbing, guttering and drainage improvements and right-of-way acquisition, and (4) the issuance of the City's capital improvement bonds in the aggregate principal amount of not to exceed $2,100,000 for the purpose of financing all or a portion of the costs of acquisition and construction of certain City trail system improvements, which may include related pedestrian signal and drainage improvements and right-of-way acquisition. If the issuance of any of the aforementioned capital improvement bonds (collectively, the "Bonds") is approved by the electors of the City, such Bonds may thereafter be issued in one or more series from time to time in an aggregate principal amount not to exceed the respective principal amount(s) approved by the City's electors. If approved by the electors of the City and issued, the Bonds shall be secured by a pledge of and a lien upon all of the receipts of the Sales and Use Tax, as authorized by the Local Government Bond Act.
Section 3. That there be, and there is hereby called, a special election to be held on Tuesday, September 12, 2006, at which election there shall be submitted to the electors of the City the questions of the issuance of the Bonds.
Section 4. That the questions shall be placed on the ballot for the special election in substantially the following forms:
The bonds described below that are approved may be combined into a single issue or may be issued in series from time to time. If the bonds for one or more of the purposes described below are approved, there will be levied (i) a one-quarter of one percent (0.25%) sales and use tax (the "0.25% Sales and Use Tax") and (ii) a three-quarter of one percent (0.75%) sales and use tax (the "0.75% Sales and Use Tax"), the net collections of which remaining after the State of Arkansas deducts its administrative charges will be used solely to retire the bonds and obligations of the City with respect thereto. The levy and collection of the 0.25% Sales and Use Tax will commence on January 1, 2007. The aforementioned 0.75% Sales and Use Tax will replace an existing three-quarters of one percent sales and use tax (the "Prior Tax"). The Prior Tax is pledged to the payment of certain existing indebtedness of the City and will continue to be levied and collected until such existing indebtedness is paid in full. The levy and collection of the 0.75% Sales and Use Tax shall commence on the day following the date of expiration of the Prior Tax.
Question One:
There is submitted to the qualified electors of the City of Fayetteville, Arkansas, the question of the issuance of capital improvement bonds in principal amount not to exceed $25,000,000 (the "Wastewater Improvement Bonds") pursuant to Title 14, Chapter 164, Subchapter 3 of the Arkansas Code of 1987 Annotated (the "Local Government Bond Act") for the purpose of financing all or a portion of the costs of acquisition, construction, reconstruction, extension and equipping of certain improvements to the City's wastewater treatment plants, sewerage and related facilities. If the issuance of the Wastewater Improvement Bonds is approved, the Wastewater Improvement Bonds shall be secured by a pledge of and lien upon (i) all of the receipts of the 0.25% Sales and Use Tax and (ii) all of the receipts of the 0.75% Sales and Use Tax, each levied pursuant to the Local Government Bond Act.
Vote on the question by placing an "X" in one of the squares following the question, either for or against:
FOR the issuance of Wastewater Improvement Bonds in principal amount not to exceed $25,000,000 for the purpose of financing all or a portion of the costs of acquisition, construction, reconstruction, extension and equipping of certain improvements to the City's wastewater treatment plants, sewerage and related facilities, including right-of-way acquisition
AGAINST the issuance of Wastewater Improvement Bonds in principal amount not to exceed $25,000,000 for the purpose of financing all or a portion of the costs of acquisition, construction, reconstruction, extension and equipping of certain improvements to the City's wastewater treatment plants, sewerage and related facilities, including right-of-way acquisition ❑
Question Two:
There is submitted to the qualified electors of the City of Fayetteville, Arkansas, the question of the issuance of capital improvement bonds in principal amount not to exceed $17,000,000 (the "Wastewater Improvement/Refunding Bonds") pursuant to the Local Government Bond Act for the purpose of directly financing all or a portion of the costs of acquisition, construction, reconstruction, extension and equipping of certain improvements to the City's wastewater treatment plants, sewerage and related facilities (the "Project") or, alternatively, for the purpose of refunding the City's water and wastewater revenue bonds originally issued to finance all or a portion of the Project. If the issuance of the Wastewater Improvement/Refunding Bonds is approved, the Wastewater Improvement/Refunding Bonds shall be secured by a pledge of and lien upon (i) all of the receipts of the 0.25% Sales and Use Tax and (ii) all of the receipts of the 0.75% Sales and Use Tax, each levied pursuant to the Local Government Bond Act.
Vote on the question by placing an "X" in one of the squares following the question, either for or against:
FOR the issuance of Wastewater Improvement/Refunding Bonds in principal amount not to exceed $17,000,000 for the purpose of financing or refinancing all or a portion of the costs of acquisition, construction, reconstruction, extension and equipping of certain improvements to the City's wastewater treatment plants, sewerage and related facilities, including right-of-way acquisition ❑
AGAINST the issuance of Wastewater Improvement/Refunding Bonds in principal amount not to exceed $17,000,000 for the purpose of financing or refinancing all or a portion of the costs of acquisition, construction, reconstruction, extension and equipping of the improvements to the City's wastewater treatment plants, sewerage and related facilities, including right-of- way acquisition ❑
Question Three:
There is submitted to the qualified electors of the City of Fayetteville, Arkansas, the question of the issuance of capital improvement bonds in principal amount not to exceed $65,900,000 (the "Street Improvement Bonds") pursuant to the Local Government Bond Act for the purpose of financing all or a portion of the costs of acquisition, construction and equipping of certain street improvements. If the issuance of the Street Improvement Bonds is approved, the Street Improvement Bonds shall be secured by a pledge of and lien upon (i) all of the receipts of the 0.25% Sales and Use Tax and (ii) all of the receipts of the 0.75% Sales and Use Tax, each levied pursuant to the Local Government Bond Act.
Vote on the question by placing an "X" in one of the squares following the question, either for or against.
FOR the issuance of Street Improvement Bonds in principal amount not to exceed $65,900,000 for the purpose of financing all or a portion of the costs of acquisition, construction, reconstruction, repair, straightening and widening of certain City streets, which may include related sidewalk, traffic signal and control, curbing, guttering and drainage improvements and right-of-way acquisition .
AGAINST the issuance of Street Improvement Bonds in principal amount not to exceed $65,900,000 for the purpose of financing all or a portion of the costs of acquisition, construction, reconstruction, repair, straightening and widening of certain City streets, which may include related sidewalk, traffic signal and control, curbing, guttering and drainage improvements and right-of-way acquisition
Question Four:
There is submitted to the qualified electors of the City of Fayetteville, Arkansas, the question of the issuance of capital improvement bonds in principal amount not to exceed $2,100,000 (the "Trail Improvement Bonds") pursuant to the Local Government Bond Act for the purpose of financing all or a portion of the costs of acquisition, construction and equipping of certain City trail system improvements. If the issuance of the Trail Improvement Bonds is approved, the Trail Improvement Bonds shall be secured by a pledge of and lien upon (i) all of the receipts of the 0.25% Sales and Use Tax and (ii) all of the receipts of the 0.75% Sales and Use Tax, each levied pursuant to the Local Government Bond Act.
Vote on the question by placing an "X" in one of the squares following the question, either for or against:
FOR the issuance of Trail Improvement Bonds in principal amount not to exceed $2,100,000 for the purpose of financing all or a portion of the costs of acquisition and construction of certain City trail system improvements, which may include related pedestrian signal and drainage improvements and right-of-way acquisition. ❑
AGAINST the issuance of Trail Improvement Bonds in principal amount not to exceed $2,100,000 for the purpose of financing all or a portion of the costs of acquisition and construction of certain City trail system improvements, which may include related pedestrian signal and drainage improvements and right-of-way acquisition.
Section 5. That the election shall be held and conducted and the vote canvassed and the results declared under the law and in the manner now provided for Arkansas municipal elections unless otherwise provided in the Local Government Bond Act, and only qualified voters of the City shall have the right to vote at the election. The City Clerk is hereby directed to give notice of the special election by one advertisement in a newspaper of general circulation within the City, the publication to be not less than ten (10) days prior to the date of the election.
Appendix Number 2: Advantages and Disadvantages of
The proposed West Mount Comfort Relocation
The proposed West Mound Comfort relocation has few advantages and many disadvantages and is dangerous for vehicles, pedestrians and bicycles:
The Proposed West Mount Comfort reconfiguration/relocation to the commercial development lot is bordered by grocery store on the South side, by James Street on the North side and by the current West Mount Comfort/Garland on the East side. See Attachment 1 for an overlay drawing on an aerial photograph of the area local to the commercial development lot.
Advantages:
As far as I can tell there is only one advantage to the proposed relocation/reconfiguration of West Mount Comfort and even so this advantage has built-in dangers.
The advantage: enables a right turn for vehicles traveling South on North Garland bound for West Mount Comfort traffic permitting.
The built-in dangers of this advantage: Vehicles making the above referenced right turn onto West Mount Comfort must navigate a sharp curve to the right around a radius estimated to be in excess of 150 degrees while other vehicles could be entering from James Street on the left and from the nearby businesses on the right. After the vehicle has driven around this challenging curve it is on a reversed trajectory almost parallel to North Garland from which it started.
West Mount Comfort bound vehicles traveling North on North Garland and which speed-up to cross the south flowing traffic and move onto the above proposed challenging sharp right curve will be even more accident prone.
Disadvantages/Illustrations/comments:
The current proposed design extends West Mount Comfort over more than approximately 50% of the eastern half of this commercial development lot in a curve achieving a 90 degree turn into North Garland. This design has several serious flaws:
1) West Mount Comfort traffic will be directed into an intensely busy and congested area of North Garland bordered by many entrances and exits.
The City/State will have missed the opportunity to move West Mount Comfort’s intersection with North Garland to the North: more removed from the intense traffic in the busy section of North Garland.
2) The West Mount Comfort intersection with North Garland does not align with an opposing street entrance. To illustrate: A cautious East bound driver in a vehicle on West Mount Comfort headed East will likely turn right onto North Garland, proceed South on North Garland to the traffic light where North Street intersects North Garland , then turn left, and continue East on North Street. Vehicles traveling this route add congestion to the busy section of North Garland.
Had there been an opposing street entrance directly across from the West Mount Comfort exit onto North Garland along with a stoplight properly timed with the North Street/Wedington intersection with North Garland, the same vehicle could have simply driven across North Garland and proceeded East. The advantages of this West Mount Comfort opposing street configuration are: a) vehicles don’t travel into the busy North Garland area thus reducing North Garland traffic congestion, and
b) Safety: vehicles do not have to make two turns and a lane change in intense traffic on North Garland, to head East.
3) There is no real benefit of the proposed West Mount Comfort configuration for South bound vehicles turning right onto North Garland from West Mount Comfort : compared to the current West Mount comfort configuration at its intersection with North Garland.
· Please see Attachment 1 and note the over-lay drawing of the proposed intersection of West Mount Comfort with North Garland.
· The proposed West Mount Comfort intersection with North Garland is about 150 feet wide.
· Drivers tend to drive along the right side of the road to avoid driving off the road.
· Note that West Mount Comfort sweeps to the right along the curved roadway of the proposed design at the intersection of West Mount Comfort with North Garland.
Now consider South bound drivers who drive along the right side of the curved West Mount Comfort roadway and stop on West Mount Comfort at the intersection of West Mount Comfort with North Garland.
In the Attachment 1, note the position of the current West Mount comfort roadbed at the intersection: drivers will find themselves in the about the same physical location on the proposed West Mount comfort intersection with North Garland as they do now with the current West Mount Comfort intersection with North Garland!
Comparing the proposed West Mount Comfort intersection with North Garland with the current intersection of West Mount Comfort with North Garland , each of these drivers will still have to twist their torso and crane their neck to the left to see the oncoming South bound traffic on North Garland. In this important example there is no redeeming payoff for a) the expense of the proposed reconfiguring of West Mount Comfort and b) damage of the two properties overrun, three if the increased damage to the grocery store’s parking lot is included.
Should the drivers referenced above decide to abandon the right side of the West Mount Comfort and drive to the approximate center of the very wide proposed intersection of West Mount Comfort with North Garland, each driver will have to compete for driving space on North Garland with vehicles departing the liquor store and the gas station (both across from the West Mount Comfort intersection with North Garland): These vehicles will be arbitrarily turning North or South on North Garland. Avoiding these vehicles will be a continual danger for the above drivers, and in turn for those vehicles stacked along the proposed West Mount Comfort reconfiguration.
When turning to the South onto North Garland these West Mount Comfort drivers who stopped at the center of West Mount Comfort will also have to avoid other drivers that had decided to stay to the right on West Mount Comfort instead of moving to the center of the West Mount Comfort intersection with North Garland. These drivers will at the same time have to concentrate on avoiding vehicles leaving the nearby North-most exit from grocery store parking lot.
In the above discussion, the driver has to be concerned that vehicles will randomly compete with him/her for driving space at/near the West Mount Comfort/North Garland intersection.
These competing vehicles can approach the above vehicle from almost any direction: the result of a proposed West Mount Comfort design configuration that endangers drivers in the same ways and in new ways as compared to the current Mount Comfort configuration.
4) The proposed West Mount Comfort design configuration reduces the number of vehicles that can be on James Street waiting to get onto West Mount Comfort. Because of the large number of vehicles in the College Park apartment area with exit/entrance on James Street and those anticipated to be in a another proposed 350 unit development on James Street, this reduction in vehicle stacking distance is an important issue: it is likely that some of the residents on James Street will be unable to exit their driveways because of stacked vehicles on James Street waiting to get onto the proposed West Mount Comfort Road.
5) Crossing the Street from the commercial development lot is dangerous with the proposed West Mount Comfort configuration: With the proposed West Mount Comfort design configuration, bicycle and foot traffic will have a very difficult time crossing from the South West (commercial development lot) side of the West Mount Comfort intersection with Garland Avenue, to the gas station area and liquor store area of Oak Plaza. This traffic to Oak Plaza will have to cross vehicle traffic on West Mount Comfort , five lanes of traffic on the proposed North Garland including vehicles departing the liquor store, the grocery store North Exit, and the gas station: very dangerous!
6) Crossing the Street from the North side of the grocery store parking lot is dangerous with the proposed West Mount configuration: If pedestrian and bicycle traffic chooses to go further South before crossing North Garland, it will have to climb stairs from the commercial development lot level up about 8 feet to the level of the grocery store parking lot: difficult for bicycles and those with disabilities. After moving up to the grocery store parking level: to get to Oak Plaza, foot and bicycle traffic will still have to cross vehicle traffic from the proposed West Mount Comfort , five lanes of traffic on the proposed North Garland including vehicles departing the liquor store, grocery store North Exit, and the gas station: very dangerous!
7) The University bus loads/unloads passengers in this same proposed intersection area: on North Garland at the south side of the proposed West Mount Comfort intersection with North Garland: another danger to foot and bicycle traffic crossing North Garland from this area.
8) High density proposed intersection use from nearby high density apartments: The heavy influx of foot and bicycle traffic from the proposed 350 condominium units at the west end of James , nearby College Park apartments plus the grocery store foot traffic and vehicle traffic on the proposed reconfigured West Mount Comfort and North Garland: means that all of the above will result in a confusing competition for space within the proposed West Mount Comfort /North Garland intersection area: navigating this intersection will be extremely complicated and dangerous.
9) Stoplight for the Proposed West Mount Comfort/North Garland Intersection Could Cause Gridlock
From my discussion with the City and the Arkansas Highway Traffic Division: North Garland is “an uncontrolled access locality”. As explained to me: this means that there is no regulation that specifies minimum distances between stoplights although there may be some guidelines. At the time I enquired on about 7-14-08, the stoplight placement on North Garland hadn’t been specified by the Arkansas Highway and Traffic Department.
The distance from the proposed West Mount Comfort’s intersection with North Garland to the North Street/North Garland intersection is only about 500 feet. A stoplight this close to the North Street/North Garland intersection’s stoplight could gridlock the traffic on North Garland and make the traffic on North Garland and at the North Street/North Garland intersection worse than it is now. This is because of the following:
· red/green timing of the stoplight s at the North Street/North Garland intersection,
· the timing of the stoplight at the proposed West Mount Comfort/North Garland intersection,
· the short distance (small number of vehicles ) that can be accommodated between the two stoplights,
· the entry and exits of vehicles from the businesses between the stoplights,
· the entry and exits of vehicles from the businesses near West Mount Comfort/North Garland intersection stoplight (liquor store and the gas station, and what used to be the barbecue restaurant), and
· traffic intensity
Those listed above are only a few of the variables.
To illustrate gridlock: if the North Street/North Garland stoplight turns red for North Garland and there are a stacked line of cars, say about 50 or more vehicles, stretching from the North Street/North Garland intersection back North through the proposed West Mount Comfort/North Garland intersection and the stoplight at the proposed West Mount Comfort/North Garland intersection turns green when viewed from proposed West Mount Comfort, there will be cars on North Garland blocking the proposed West Mount Comfort entrance to North Garland: gridlock.
Use the “Fayetteville Involvement Meeting “ aerial map only for a general idea of the proposed North Garland widening: I believe that the aerial photo map distributed at the 19 June 2008 Fayetteville Public Involvement Meeting and the yellow overlay drawing were intended only to convey a general idea of the proposed widening of North Garland. This distributed map does not show how the neighborhood yards will be overrun, and how the usefulness of some buildings will be significantly impaired. Even if a building itself is not condemned, the noise level from a close five lane highway will make some buildings very uncomfortable places to be. The map distributed at the Fayetteville Involvement Meeting shows that the proposed West Mount Comfort has all the advantages of a 90 degree intersection with North Garland: a more detailed map (see Attachment 1) indicates that the proposed West Mount Comfort Road has few of these advantages. The Fayetteville Involvement Meeting’s aerial photo overlay map shows that the current West Mount Comfort intersection with North Garland is not part of the proposed reconfiguration of West Mount Comfort intersection with North Garland:
In more detailed drawings (see Attachment 1) almost all of the current intersection of West Mount Comfort with North Garland is contained inside the proposed West Mount Comfort intersection with North Garland.
Note on the more detailed /accurate aerial overlay map of Attachment 1, that a South bound vehicle on North Garland turning West to enter the proposed West Mount Comfort intersection and moving West on the proposed West Mount Comfort will have to turn to the right for an estimated 150+ degrees (almost a full reversal of direction) in the very short time it would take the vehicle to pass James Street. My understanding is that the City of Fayetteville does not approve turns that exceed 135 degrees.
At the same time as the above vehicle driver is turning to the right around the above described difficult curve, the driver will have to be aware of vehicles exiting to the North and South from James, and a large amount of foot traffic and bicycle traffic to James from Oak Plaza and vice versa. In addition, the businesses within the curve, on the right hand of the curve described above (if they survive the North Garland widening process) will have vehicles entering and leaving their premises within the same James Street/proposed West Mount Comfort intersection area and also West bound vehicles from the North and South turning into James Street from the proposed West Mount Comfort, perhaps all occurring at the same time. Again other vehicles, foot traffic and bicycles can intersect the above vehicle from almost any direction!
Even in the best of conditions where all of the vehicle drivers, foot traffic and bicyclers are competent, the dangerous situations described above may be more challenging than some drivers can accommodate.
Appendix 3: A Vision for the Commercial Development Lot
The vision is a research facility linking the University of Arkansas with other research facilities in the State, nation and world with a mission to improve the quality of life for Arkansans and others while contributing to the economic development of the City.
Such a facility would provide local jobs and be a tax revenue source for Fayetteville. Such a facility would also support the new work model: workers living at close proximity to their work locations.
This research facility makes a lot more sense than destroying the commercial development lot property for a badly designed road which funnels traffic into an already intensely traveled North Garland area where vehicles, pedestrians and bicyclers are each in danger.
Should this proposed road over the commercial development lot become a reality, it is anticipated that future or concurrent City/State mandated easements and right-of-way would destroy the usefulness of the remainder of this commercial development lot. Thus, the local neighborhood could be encumbered with a lot full of unattractive utility facilities, access covers and panels, antennas, etc.
Appendix 4: Proposed West Mount Comfort to Overrun 1107 James Street Front Yard:
1107 James Street is at the corner of James Street and the current West Mount Comfort. This house is located North across James Street from the commercial development lot (which is itself the lot North of the grocery store).
Land taken from the front yard of 1107 James is being used in the proposed reconfiguration of West Mount Comfort and thus enables its dangerous intersections with North Garland and James: See Attachment 1 to view how 1107 James is being used for the proposed reconfiguration.
It is bad enough to have property condemned and taken away for a just and noble reason: for some reason that truly helps people. It is humiliating and disgraceful to be forced to provide property for a purpose that will harm local individuals, disabled individuals, foot traffic, bicyclers and drivers attempting to travel on and or across the proposed reconfiguration of West Mount Comfort and its proposed intersection with North Garland, and its intersection with James Street.
Detail about 1107 James Street……
At the Fayetteville Public Involvement Hearing on June 19, 2008, I voiced concern that the proposed West Mount Comfort would be elevated above what would remain of the front yard at 1107 James Street. The concern was about flooding because the proposed West Mount Comfort will block the normal drainage of 1107 James Street house and yard. During heavy rain, water could back up in the yard and damage the house.
One of the state’s engineers said that was the reason that a storm drain would be placed in the front yard. Of course someone will have to maintain and clear this storm drain. Leaves and yard waste could be a problem if the trees are not cut down both on this property and on the neighbor’s property: leaves in a combination with other yard waste will clog most grated drains. Miscellaneous debris is on many occasions discarded in this area and could easily clog a drain.
Keeping this drain functional will be a continuing expense, and if the drain clogs, 1107 James and perhaps other local houses may suffer damage.
It is possible that many front yards along North Garland could face these same kinds of drainage problems if the proposed 5 lane highway is constructed.
Appendix Number 5: Wild Speculations about the future of the North Garland Area
Trying to understand the present by looking ahead to what might be the eventual goals/objectives of the proposed changes to North Garland and West Mount Comfort:
Why is North Garland Avenue proposed for widening: West Mount Comfort proposed for reconfiguration? We have to ask ourselves why the proposed plan severely damages businesses and households along North Garland Avenue. Is it simply that the University needs more stacking space for vehicles? Are there other compelling reasons for the proposed widening of North Garland?
Is this proposed plan only the beginning?
Consider the proposed reconfiguration of West Mount Comfort Road. My understanding of city street engineering and good practice from those with professional experience indicates that streets should line up with each other: that is, West Mount Comfort if reconfigured should line up with another street like for example the nearby Holly Street. The City of Fayetteville has some pride in developing an effective grid structure within the city.
The proposed reconfigured West Mount Comfort does not line up with another street: Why not?
Well, perhaps the proposed West Mount Comfort lines-up with a street which is yet to be built. We could imagine where such a new street might be constructed by sighting East from the entrance of the proposed West Mount Comfort intersection with North Garland. Doing so, we could imagine that a new street could be extended East to line-up with the current section of the proposed West Holly that runs between Oakland and Leverett.
Such carving-up of the local area might damage it so much that it could be bought cheaply and used for another purpose: University parking, convention center, Wal-Mart, hotel, you name it…
Why carve up Garland Avenue household property at the same time? A possible reason is that the entire .75 mile section of North Garland is targeted for reconfiguration and commercialization: after people have moved away or given-up hope.
As noted earlier, the proposed West Mount Comfort intersection with North Garland Avenue is about 150 feet wide. Planners know that intersections are expensive to build. In this speculation, if the planners have made the proposed intersection 150 feet wide, it signals that the current West Mount Comfort is eventually to be planned as a four lane road. This future West Mount Comfort four lane road could be another conduit form the West to whatever is planned for the local North Garland area: University parking facilities, convention center, Wal-Mart, you name it….
If this future West Mount Comfort four lane road were to cross from the North Garland area to Leverett that would fuel a speculation that Leverett would become a four lane highway sometime in the future.
Is this speculation believable? What gives this speculation credence is:
1) The first evidence of credibility: the proposed reconfiguration of West Mount Comfort does not line-up with an opposing street.
2) A second evidence of credibility for this speculation is that the proposed reconfiguration of West Mount Comfort is dangerous to the traveling public and to bicycles and pedestrians. If public safety were the objective in the proposed reconfiguration of West Mount Comfort, the intersection of West Mount Comfort would have been moved further North and lined-up with an opposing street such as Holly, or even further North on North Garland. If public safety is not the key objective for the proposed West Mount Comfort reconfiguration, then there could be a hidden agenda.
3) The third evidence of credibility: The approximate three to one mismatch of the traffic carrying capacity of the entrance to the University (South Garland) with the three roads feeding it (North Garland, North Street, Wedington) means that widening North Garland would not be very helpful for getting traffic into the to the University quickly.
Thus it is reasonable to suspect that there is another reason for the proposed widening of West Garland Avenue: a widened North Garland Avenue would be useful for feeding traffic to the North Garland area for whatever is to be constructed there in the future. A residential North Garland which has been damaged/destroyed by a 5 lane highway across it would be ripe for commercial development.
Fayetteville Transportation Improvement Program
Reference Operations Director’s letter to the City Council dated June 7, 2006
See next image
Attachment 1: Proposed West Mount Comfort
See next image
Attachment 2: Highway 112 Spur-North, Excerpt of the Preliminary Construction Plans from the Arkansas Highway and Transportation Department
See next image
Wislon©2008 Unlimited number of copies authorized for distribution.
Windows Live™
Home Hotmail Spaces OneCare
MSN
aubreyshepherd@...
Sign out
Inbox (3774)
Junk
Drafts (10)
Sent
Deleted
Manage folders
Today
Mail
Contacts
Calendar
New
Reply
Reply all
Forward
Delete
Junk
Options
Attachments, pictures, and links in this message have been blocked for your safety. Show content
From Glen David Wilson: Please distribute the enclosed to Neighborhood Asssociation members and others: Attend Street Committee meeting: See information and schedule below
From: Glen David Wilson (technical@cox.net)
You may not know this sender.Mark as safe|Mark as unsafe
Sent: Fri 8/15/08 8:38 PM
To: aubreyshepherd@hotmail.com
Security scan upon download
clip_imag...jpg (59.2 KB), clip_imag...jpg (65.2 KB), clip_imag...jpg (61.0 KB), clip_imag...jpg (56.2 KB), clip_imag...jpg (41.6 KB), clip_imag...jpg (86.9 KB), clip_imag...jpg (86.8 KB), clip_imag...jpg (87.8 KB)
--Wards protecting Wards to preserve Fayetteville--
Save North Garland Avenue and West Mount Comfort Road
EMERGENCY NEWS
5 LANE Highway Threatens substantial damage to households and businesses on .75 Mile Section of North Garland and on West Mount Comfort Road
(Use Page Down for the following pages)
· Page 4: How did North Garland get into this “Widening” Problem?
Look for your house and or business on the diagrams excerpted from AHTD Preliminary Construction Plans, Attachment 2.
· Page 5: But Now in 2008, everything has Changed
· Page 6: Why is North Garland Being Widened?
· Page 7: A better method of providing fast access to the University
· Page 7: How many more lanes should North Garland have to promote fast traffic access to the University?
· Page 7: Design Your Own Version of A North Garland Profile(cross-section)
· Page 8: Other North Garland Improvements?
· Page 9: Arkansas State Highway and Transportation Department Preliminary Construction plans for the proposed North Garland
· Page 9: The City/State Proposed Relocation of West Mount Comfort Road: Map in Attachment 1
· Page 10: An Important Decision is Where to Relocate the Intersection of West Mount Comfort Road with North Garland
· Page 11: Wild speculations about the future of the North Garland Area
· Page 11: My conclusions
· Pages 12: What can you do to stop the damage to North Garland and the dangers of the proposed reconfiguration of West Mount Comfort
· Page 15: Email and call list attached!
A Call to Action
Reference: Arkansas Highway and Traffic Department (AHTD) Job Number 040489--Highway 112 Spur—North (Fayetteville)
How did North Garland get into this “widening” Problem?
Back in 2006 when the economy was better, and gasoline prices were lower, the Fayetteville City Council determined that there was a critical need for an additional source of revenue to finance wastewater facilities and Street and Trail improvements within the city.
The City Council acted out of a need for additional bond sources for completion of the Waste Water System Improvement Program and also based upon community-wide Citizen Surveys of 2004 and 2005. During an 18 month period the City Council/Street Committee discussions on major street improvement evolved into a 3 Phase program. “Phase 1 was proposed to be a 6-year $62,000,000 program, providing traffic capacity and safety improvements and economic development opportunities to those corridors with the most need. Later Phases, through additional bond elections, will address additional safety, capacity, and economic development needs. The resources required for the initial phase of the Transportation Improvement Program is $62,000,000 plus bond and debt placement and surety costs.” Paraphrasing in this paragraph and quotation are from the City Operations Director’s letter to the City Council dated June7, 2006. See Appendix 6 for a list of the Phase 1 projects and estimated costs as of June 7, 2006. Project Number five is the North Garland project.
To obtain this revenue, the City Council passed Ordinance 4891 on June 20, 2006. Ordinance 4891 authorized a special election on September 12, 2006. Four Questions were put to qualified Fayetteville voters for a decision. See Appendix 1: Excerpt from Fayetteville’s Ordinance 4891, Pages 4 through 6.
Bonds for each Question are secured by a pledge of and lien upon (i) all of the receipts of the .25% Sales and Use Tax and (ii) all of the receipts of a renewed .75% Sales and Use Tax, each levied pursuant to the Local Government Bond Act.
Each Question refers to an individual Bond Name:
· Question One: “Wastewater Improvement Bonds”
· Question Two: “Wastewater Improvement/Refunding Bonds”
· Question Three: “Street Improvement Bonds”
· Question Four: “Trail Improvement Bonds"
The Special Election result was YES for all of the above Questions. See Appendix 1 for the Special Election Ballot Questions and other information excerpted from Ordinance 4891.
North Garland was selected by the City Council/Street Committee from a list of Transportation Improvement Projects for “Widening-5 Lane Principal Arterial”. The North Garland estimated cost from the “City of Fayetteville, Transportation Improvement Plan” is $6,695,000.
The bonds issued following the Special Election were issued with an assumed annual growth rate of the City’s Sales Tax Revenue of 4% as shown at the end of Appendix 1, Finance Plan: Wastewater System and Transportation Plan, note Assumption 1. Would this be a valid assumption in a recession or an economy slowdown condition?
And that ends the explanation of how North Garland got into this “widening” problem.
But now in 2008, everything has changed. Some say the economy is in recession.
According to the City of Fayetteville Press Release of July 25, 2008 referring to Mayor Coody: “He also called attention to the declining federal funds available to assist cities and counties across the country with major infrastructure projects and the fact that current estimates to simply maintain the current condition of our public infrastructure exceed existing revenue streams at all levels of government.” Bold print emphasis provided by the author.
The City has a hiring freeze at the time of this writing. This is an indication of uncertainty about tax revenue and a declining economy. Apparently the City can finance and build street improvement projects but will the funds be there for maintaining these projects and other infrastructure?
Would it be in the city’s best interest to:
· allocate the $6,695,000 2006 budgeted funds to a more pressing City need, and defer the North Garland widening project until there is unity within the North Garland community?
· delay the North Garland widening project until the City is more certain that there will be sufficient tax revenue for bond payments and infrastructure maintenance?
Why is North Garland being Widened?
It is my understanding from an Alderman on the Street Committee that the purpose of the North Garland widening is to provide increased traffic access to the University. Can widening North Garland do this?
Three streets feed the northern entrance to the University (South Garland):
1. North Street: Traffic from the East including College Avenue and all connecting streets
2. Wedington Drive: traffic from the West, Highway 540 and all connecting streets
3. North Garland: traffic from the North, Highway 540 and all connecting streets
The intersection of these streets forms a plus sign (+) with North Street on the right side of the plus , Wedington Drive on the left side, North Garland on the Top, and South Garland at the bottom. The direction North is at the top of the plus sign.
The three feeder streets have a traffic capability of about 3 times (a 3 to 1 ratio) or more the traffic capability of South Garland (the key northern University entrance). Vehicles bound for the University/stadium in heavy traffic must wait their turn to get into the University entrance on South Garland. Thus, all three feeder streets become stacking areas for vehicles waiting to get into the University entrance: all three feeder streets become temporary parking lots.
Widening North Garland makes the 3 to 1 ratio worse: it simply adds more stacking area for vehicles waiting to get into the Northern entrance of the University (via South Garland). Widening North Garland means that those drivers on Wedington and on North Street will have to wait longer to get into the narrow northern entrance to the University.
Additional stacked traffic on the proposed 5 lane, widened North Garland will mean more traffic problems because of vehicles on each feeder street whose drivers are seeking to quickly get into the northern entrance to the University.
A widened North Garland will make the situation more adverse and more dangerous for moving traffic into the northern entrance to the University.
A Better Method of Providing Fast Access to the University:
A more efficient method of stacking traffic would be to park vehicles in a holding area West of Highway 540 and run busses to/from the University.
Per the City, there are no plans to widen the section of Garland South of North Street, that is, South Garland or the northern University entrance in the author’s terms. The South Garland section was completed about 2005 by the Arkansas Highway and Transportation Department. South Garland section was widened to two lanes into, two lanes out of the University, with a turning lane at major intersections.
How many more lanes should North Garland have to promote fast traffic access to the University?
A resounding ZERO is the answer. We could ask the Street Committee and the City Council to leave North Garland just as it is!
Design Your Own Version of A North Garland Profile (cross-section)
There are four possibilities for a North Garland roadway profile:
1) Leave North Garland just as it is: two lanes
2) Center Turning Lane +2 regular lanes
3) Four regular lanes
4) Center Turning lane + 4 regular lanes (as shown in Attachment 2, page 2)
Each of these possibilities can be constructed with sidewalks and or bike paths and green space/BERM on one or both sides. Profiles can have barricades/green space in the turning lane or separating lanes in each direction. It is doubtful if barricades/green space can be used on North Garland because they use excessive amounts of roadway.
Typical measurements across:
· Lanes are about 11 feet
· Turning lane about 12 feet
· Sidewalks are about 5 feet to 10 feet
· Bike paths are from about 3 feet to 5 feet
· Green space/BERM from about 3 to 9 feet
· Curbing about 1 to 2 feet
The sides of your own proposed North Garland profile don’t have to be symmetrical.
For example:
· On the East side of AHTD’s proposed design the Berm is 3 feet and the sidewalk is 5 feet.
· On the West side of AHTD’s proposed design, the Bern is 6 feet and the shared path is 10 feet.
Another bit of information, bikers are reported to prefer their bike paths on the street and they want to face the oncoming traffic for safety reasons.
A turning lane could have painted designations on the roadway where left turns are allowed. Some turning lanes have barriers designating where left turns are allowed.
With the above information you can design your own proposed North Garland Avenue Profile.
Example Profile: A two lane highway with five foot sidewalks, 3 foot Berms, 5 foot bicycle paths in each direction, and 2 foot curbs would be 52 feet wide.the calculation for this profile from left to right is 5+3+2+5+11+11+5+2+3+5=52. If the bicycle paths were only 3 feet wide, the total profile width would be 48 feet.
To see the effect of a 52 foot North Garland Profile on local residences and businesses, we would need to draw our example 2 lane highway on a detailed map of North Garland. We shall ask the City to assist us with this and other candidate profiles as requested in “My Conclusions” at the end of this Call to Action.
Other North Garland Improvements?
Would we like to improve North Garland? We could have a three lane highway with specifically marked spots for turning from the center lane. Any 3 lane plan would have to be acceptable to the owners of residences and business of North Garland.
A turning lane with designated turning areas would enhance the flow of North Garland traffic because vehicles would be less likely to stop on the right-most roadway while waiting to turn left.
The already expanded 4 lane section of North Garland near the North Street/Garland intersection should not be expanded further except for sidewalks some of which already exist, and possibly on street bicycle paths depending on the street design and the nearby business land availability (if any).
If a three lane highway were implemented instead of a five lane highway, there could possibly be enough savings to extend the three lane highway north to Highway 540: this could provide benefits for the local North Garland area residents and businesses.
Adding more than 2 lanes and sidewalks/bike paths means that residents and businesses along North Garland would suffer even more losses and grief/anger at having been harmed by the City.
Arkansas State Highway and Transportation Department’s Preliminary Construction Plans for North Garland
The Arkansas State Highway and Transportation Department’s preliminary construction plans for “Hwy. 112 Spur-North” (See Attachment 2) show that the 5 lane highway will run very close to some commercial and residential buildings, eliminate any on street parking, and require a change to the present Garland Street store entrance.
The City/State proposed 5 lane highway through residential and commercial North Garland will damage both commercial and residential property. Slices of property that the City/State has proposed to take from each residence could leave some residences so close to the 5 lane highway that the houses will be persistently uncomfortable living spaces because of the highway noise.
The same is true for some of the commercial buildings on North Garland. It is possible that a 5 lane highway through North Garland would destroy the utility of some commercial buildings due to noise and other 5 lane highway deleterious effects. The owners would not necessarily be compensated if the house/commercial buildings were not legally taken or condemned.
The City/State Proposed Relocation and Reconfiguration of West Mount Comfort
As a part of the North Garland widening, the City/State has chosen to reconfigure and relocate West Mount Comfort: the current West Mount Comfort is the angled road which intersects North Garland just North of the Harps grocery store.
· The proposed relocated/reconfigured West Mount Comfort has been put into the very busy/congested area of North Garland which has many entrances/exits: See map in Attachment 1: Proposed West Mount Comfort.
· The proposed configuration for West Mount Comfort travels over the front yard of 1107 James Street, makes a 90 degree turn across the commercial development lot just North of the grocery store, before making an intersection with North Garland.
· The entrance of the proposed reconfigured West Mount Comfort is about 150 feet wide which is about twice the entrance width of the East section of Mount Comfort (on the East side of North Garland and South about 240 feet).
The combination of this proposed West Mount Comfort/North Garland intersection and the proposed widening of North Garland will eliminate at least 22 parking spaces from the grocery store, producing traffic congestion within the remaining grocery store parking area and making it more difficult for vehicles and bicycles to enter and exit the remaining grocery store parking area. These changes will make it more difficult for the grocery store to turn a profit and continue paying taxes to the City at the same volume of business as now.
Harps grocery store, is the “anchor” property and largest business in the North Garland area: Grocery store parking is important to the shopping public, students and residents in the entire North Garland area.
When I made my “North Garland” presentation of the above and more to the Ward 2 meeting July 8, 2008, I demonstrated, using a large overlay aerial chart, how dangerous the proposed West Mount Comfort intersection with North Garland is for pedestrians, bicycles and vehicles. Motorcycles are included in the vehicle category herein.
I received good support from those assembled: most had already decided for themselves that the 5 lane North Garland Widening program didn't make sense. The North Garland Widening program will take the front yards (and more) of many of the local North Garland residents. It will damage businesses and reduce tax revenue to the City.
I would like to make this same presentation at the Street Committee Meeting on August 18, 2008 in City Hall room 326.
An Important Decision is Where to Relocate the Intersection of West Mount Comfort Road with North Garland.
The location proposed by the City/State routes West Mount Comfort traffic into the “most challenging” and busy section of North Garland and is dangerous to vehicles, pedestrians, and bicycles.
· See the map in Attachment 1: “Proposed West Mount Comfort”.
· See Appendix Number 2: “The proposed West Mount Comfort Relocation” for a discussion of these dangers.
· See Appendix 3: “A Vision for the Commercial Development Lot”.
· See Appendix 4: “Proposed West Mount Comfort to Overrun 1107 James Street Front Yard”.
Wild Speculations about the Future of the North Garland Area:
See Appendix 5 for Wild Speculations about the future of the North Garland Area. In appendix 5 I am trying to understand the present proposals by the City/State by speculating about the future. If we can understand what might happen in the future, we could have a chance to make choices and changes for the better now.
My Conclusions:
1) Ask the City/State to study and diagram the following North Garland options:
· Option 1: Don’t do anything to North Garland; reallocate the budgeted funds for other City projects. Minimal cosmetic improvements might be acceptable and can be suggested/diagrammed by the City /State.
· Option 2: 2 lanes + sidewalks + bike path(s) on the street
· Option 3: Turning lane + 2 lanes + sidewalks + bike path(s)
· Option 4: Consider/diagram/cost extending any North Garland improvements North to Highway 540.
Requested Guidelines to the City/State: Minimize damage to residential and commercial property.
All options and alternatives shall subject to review, revision and approval/disapproval by the North Garland community at one or more “involvement meetings”. Provide a written rationale for your preliminary designs.
2) Totally reject the proposed West Mount Comfort location and configuration
It is dangerous to vehicles, pedestrians and bicycles and increases congestion in the already busy and congested area of area of North Garland which is within the range of about 500 feet of the Garland/North Street intersection.
Ask the City to provide three alternative locations and configurations for West Mount Comfort.
Requested Guidelines to the City/State: Minimize damage to residential and commercial property and minimize the impact of West Mount Comfort traffic in the busy and congested area of North Garland which is within the range of about 500 feet of the Garland/North Street intersection.
All options and alternatives shall subject to review, revision and approval/disapproval by the North Garland community at one or more “involvement meetings”. Provide a written rationale for your preliminary designs.
3) Delay the entire North Garland Widening project until there is unity and agreement of the North Garland community.
4) Request the City/State to establish specific personal methods including email and or regular mail for communications to each individual property owner of the North Garland community so that City’s councils and committees and or State discussions of their property will be made known to them in a timely manner. Timely manner herein means at least 10 days before the next meeting of the City council or committee within which the property discussion occurred. Group meetings shall not be a substitute for these timely notifications.
What can you do to stop the damage to North Garland and the dangers of the proposed reconfiguration of West Mount Comfort?
Go to the Street Committee Meeting: Monday, August 18, 4:30 PM
in City Hall Room 326
We have a chance to save North Garland and choose a safer area for the relocation of the Proposed West Mount Comfort’s intersection with North Garland.
……….But only if we Express our opinions………..
The Monday, August 18, 2008 Street Committee meeting in Room 326 will be your opportunity to voice your concerns about the North Garland widening and the dangerous proposed relocation of the North Garland/West Mount Comfort intersection. Your attendance and your neighbor’s attendance could make the difference!
Expect that attendees will be allowed to make comments when the Committee Chairman acknowledges your raised hand after some discussion within the Committee.
My view is: We don’t know when a final decision about North Garland will be made or if this is the last meeting where we can express our opinions: We should direct our energy toward this meeting and the attached Call/Email List! Let’s stop/revise this 5 lane Bulldozer now!
Your opinion Counts!
Let’s Make a Determined All-Out Effort to Stop the 5 Lane Highway Implementation on North Garland!
Look on accessfayetteville.com for announcements of City Council and Street Committee meetings or Call the City Clerk’s office for the date and time of these meetings. See the City Clerk’s contact information is in the Addendum after the end of the Email/Call list.
Go to the August 18, 2008 and later Street Committee Meetings.
Go to the City Council meetings.
Together we can make a difference! We must Act now!
Now: Spread the News!
1) Contact three people and enlist their support: ask them each to contact three more people and continue this expansion process …..provide each contact with a copy of “Save North Garland Avenue and West Mount Comfort Road” or at least the Call/Email List. Email forwarding works well for this.
2) Use the attached list for the City of Fayetteville and for the State of Arkansas : do some or all of the following:
These First:
1) Telephone all of those on the attached list
2) Email all of those on the attached list,
Time for more? Then do these next:
1) Send a letter,
2) Send a telegram
3) Send personal representatives to visit with members of the attached list, or go and visit with those officials who will determine North Garland’s future yourself.
Monday, August 18, 4:30 PM in City Hall Room 326
Let’s all be at the Street Committee Meeting and Save North Garland Avenue and West Mount Comfort Road!
I have done my best to let you know about the North Garland/West Mount Comfort situation as I know it. I hope to have provided a service to the North Garland community and to the city of Fayetteville.
Regards,
Glen Wilson
Email:technical@cox.net
Property Owner: West Mount Comfort/Garland
The author authorizes others to make unlimited copies of this document.
See attached Addendum for Names, telephone numbers,
and email addresses of
· Mayor/City Council/Street Committee
· Fayetteville persons who have picked-up 2008 election candidate information from the City Clerk’s office
· State of Arkansas Governor/State Senator/State Representative
· United States Senators for Arkansas
· United States House of Representatives: Congressman
· Arkansas Highway and Transportation Department (AHTD)
Addendum
I appreciate the service and dedication of the Mayor, the City Council, the Planning Commission and the Street Committee. I appreciate the Street Committee’s current review of the widening of the .75 mile of North Garland.
I share the enormous pervasive concerns of the local North Garland population.
Call/Email List for Fayetteville:
From the Fayetteville City Clerk’s Office
Mayor: Dan Coody
1418 E. Rodgers Drive
Fayetteville, AR 72701
443-6758
dcoody@ci.fayetteville.ar.us
Term End Date 12/31/2008
Alderman Positions:
WARD 1:
WARD 1:
Position 1
Position 2
Adella Gray
Brenda Thiel
1681 N Starr Drive
172 E. Willoughby Drive 72701
Fayetteville, AR 72701
Fayetteville, AR 72701
442-4958 (H) 841-5266 (Cell)
442-3095
Ward1_pos1@ci.fayetteville.ar.us
Ward1_pos2@ci.fayetteville.ar.us
Term End Date 12/31/2010
Term End Date 12/31/2008
WARD 2:
WARD 2:
Position 1
Position 2
Kyle B. Cook
Nancy Gordon Allen
1335 Vanderventer
PO Box 3105
Fayetteville, AR 72703
Fayetteville, AR 72702
521-7632
442-5536
Ward2_pos1@ci.fayetteville.ar.us
Ward2_pos2@ci.fayetteville.ar.us
Term End Date 12/31/2010
Term End Date 12/31/2008
WARD 3:
WARD 3:
Position 1
Position 2
Robert K. Rhoads
Robert Ferrell
Arvest Plaza
2413 Twin Oaks Court
75 N. East Ave Suite 402
Fayetteville, AR 72703
Fayetteville, AR 72701
442-3535
973-5202
Ward3_pos2@ci.fayetteville.ar.us
Ward3_pos1@ci.fayetteville.ar.us
Term End Date 12/31/2008
Term End Date 12/31/2010
WARD 4:
WARD 4:
Position 1
Position 2
Shirley Lucas
Lioneld Jordan
2139 Ora Drive
1600 Arrowhead
Fayetteville, AR 72701
Fayetteville, AR 72701
442-4612
442-5415
Ward4_pos1@ci.fayetteville.ar.us
Ward4_pos2@ci.fayetteville.ar.us
Term End Date 12/31/2010
Term End Date 12/31/2008
Fayetteville 2008 General Election Candidates:
The filing period to run for Municipal office is August 6, 2008 through 12:00 noon on August 26, 2008.
Thus, it was not possible to include the list of those who have actually filed as candidates.
The following is a list of people who have picked-up candidate-filing information from the City Clerk’s office.
The problem with this list is that the following list contains only names of people who have picked-up the filing information and that person may not actually be the candidate.
An updated list will probably be available from the City Clerk’s office or better still request a list of those candidates who have filled as candidates after August 6, 2008.
State of Arkansas Email/Telephone List
Arkansas Governor
· Mike Beebe
State Capitol, Room 250
Little Rock, Arkansas 72201
501-682-2345
GovernChief of Staff: 501-682-3607
Email Governor Beebe by completing the form on web page: http://governor.arkansas.gov/contact/index.php
Arkansas State Senator:
· Sue Madison
573 Rock Cliff Road
Fayetteville, Arkansas 72764
479-442-2997
madisons@arkleg.state.ar.us
Arkansas State Representative:
· Marilyn Edwards
2330 North Juneway Terrace
Fayetteville, Arkansas 72703
479-442-8388
edwards@arkleg.state.ar.us
Unites States House of Representatives:
· John Bozeman
-member of the Transportation and Infrastructure Committee
-Stacey Mattingly, Constituent Services, Intern Coordinator and District Office Manager
Lowell Office:
213 W. Monroe, Suite K
Lowell, AR 72745
Phone: (479) 725-0400
Fax: (479) 725-0408
Email Congressman John Boozman by filling in the form on web page
https://forms.house.gov/wyr/welcome.shtml
United States Senate:
· Blanche Lincoln
4 South College Avenue, Suite 205
Fayetteville, AR 72701
(479) 251-1224; FAX (479) 251-1410
Community Affairs Specialist: John Hicks
Email Senator Blanch Lincoln by using the Form on web page: http://lincoln.senate.gov/webform.html
· Mark Pryor
Little Rock Office
The River Market
500 Clinton Ave
Suite 401
Little Rock, AR 72201
Phone: (501) 324-6336
Fax: (501) 324-5320
Toll Free from AR:
(877) 259-9602
Email Senator Mark Prior by completing the form on web page:
http://pryor.senate.gov/contact/
Arkansas Highway Commission
· Jonathan D Barnett
Commissioner
1980 Highway 412 West
West Siloam Springs, Arkansas 72761
(479) 524-6269
(479) 524-9440
Arkansas Highway and Traffic Department
· Dan Flowers
Director
Arkansas Highway and Transportation Department
10324 Interstate 30
Little Rock, AR 72209
501-569-2211
· Lynn Malbrough
Arkansas Highway and Transportation Department
Division Head for Environmental
10324 Interstate 30
Little Rock, AR 72764
501-569-2281
Lynn.malbrough@arkansashighways.com
---------------------------------------End Email/Call List----------------------------------------------------------------
If you have questions about the Street Committee meeting or other meetings: Look on accessfayetteville.com for announcements of City Council and Street Committee meetings or Email/Call the City Clerk’s office for the date and time of these meetings.
City Clerk
City Administration Bldg
113 W Mountain St
Room 308
Fayetteville, AR 72701
Tel: (479) 575-8323
Fax: (479) 718-7695
Email: city_clerk@ci.fayetteville.ar.us
List of Appendices that follow:
· Appendix 1: Excerpt from Fayetteville’s Ordinance 4891, Pages 4 through 6 and the Finance Plan Slide
· Appendix Number 2: The proposed West Mount Comfort Relocation
· Appendix 3: A Vision for the Commercial Development Lot
· Appendix 4: Proposed West Mount Comfort to Overrun 1107 James Street Front Yard (like many of the yards on North Garland)
· Appendix 5: Wild Speculations about the future of the North Garland Area
· Appendix 6: Fayetteville Transportation Improvement Program, Phase 1
List of Attached Maps that follow: North is at the top of the Attachment 1 map
· Attachment 1: Proposed West Mount Comfort
· Attachment 2: Highway 112 Spur-North, Excerpt of the Preliminary Construction Plans from the Arkansas Highway and Transportation Department (you may need a magnifying glass for this one)
Appendix 1: Excerpt from Fayetteville’s Ordinance 4891,
Pages 4 through 6
the "Sales and Use Tax"). The Sales and Use Tax shall be levied and collected only on the first $2,500 of each "single transaction" (as defined in Section 9 hereof). The levy and collection of the 0.25% Sales and Use Tax shall commence on and as of such date as provided in the Local Government Bond Act, and shall cease upon retirement in full of the Bonds. The levy and collection of the 0.75% Sales and Use Tax shall commence on the day following the date of expiration of the Prior Tax, and shall cease upon retirement in full of the Bonds. Any collections of the Prior Tax received after its expiration shall be used, if necessary or appropriate, to provide for the payment of debt service on the Bonds. Revenues resulting from the collection of the Sales and Use Tax shall be utilized solely for the payment of debt service on the Bonds.
Section 2. That under the authority of Amendment 62 and the Local Government Bond Act and subject to approval by the electors of the City as provided in Section 3 below, there is hereby authorized (1) the issuance of the City's capital improvement bonds in the aggregate principal amount of not to exceed $25,000,000 for the purpose of financing all or a portion of the costs of acquisition, construction, reconstruction, extension and equipping of certain improvements to the City's wastewater treatment plants, sewerage and related facilities, including right-of-way acquisition, (2) the issuance of the City's capital improvement bonds in the aggregate principal amount of not to exceed $17,000,000 for the purpose of directly financing all or a portion of the costs of acquisition, construction, reconstruction, extension and equipping of certain improvements to the City's wastewater treatment plants, sewerage and related facilities, including right-of-way acquisition, or, alternatively, for the purpose of refunding water and wastewater revenue bonds originally issued to finance said improvements, (3) the issuance of the City's capital improvement bonds in the aggregate principal amount of not to exceed $65,900,000 for the purpose of financing all or a portion of the costs of acquisition, construction, reconstruction, repair, straightening and widening of certain City streets, which may include related sidewalk, traffic signal and control, curbing, guttering and drainage improvements and right-of-way acquisition, and (4) the issuance of the City's capital improvement bonds in the aggregate principal amount of not to exceed $2,100,000 for the purpose of financing all or a portion of the costs of acquisition and construction of certain City trail system improvements, which may include related pedestrian signal and drainage improvements and right-of-way acquisition. If the issuance of any of the aforementioned capital improvement bonds (collectively, the "Bonds") is approved by the electors of the City, such Bonds may thereafter be issued in one or more series from time to time in an aggregate principal amount not to exceed the respective principal amount(s) approved by the City's electors. If approved by the electors of the City and issued, the Bonds shall be secured by a pledge of and a lien upon all of the receipts of the Sales and Use Tax, as authorized by the Local Government Bond Act.
Section 3. That there be, and there is hereby called, a special election to be held on Tuesday, September 12, 2006, at which election there shall be submitted to the electors of the City the questions of the issuance of the Bonds.
Section 4. That the questions shall be placed on the ballot for the special election in substantially the following forms:
The bonds described below that are approved may be combined into a single issue or may be issued in series from time to time. If the bonds for one or more of the purposes described below are approved, there will be levied (i) a one-quarter of one percent (0.25%) sales and use tax (the "0.25% Sales and Use Tax") and (ii) a three-quarter of one percent (0.75%) sales and use tax (the "0.75% Sales and Use Tax"), the net collections of which remaining after the State of Arkansas deducts its administrative charges will be used solely to retire the bonds and obligations of the City with respect thereto. The levy and collection of the 0.25% Sales and Use Tax will commence on January 1, 2007. The aforementioned 0.75% Sales and Use Tax will replace an existing three-quarters of one percent sales and use tax (the "Prior Tax"). The Prior Tax is pledged to the payment of certain existing indebtedness of the City and will continue to be levied and collected until such existing indebtedness is paid in full. The levy and collection of the 0.75% Sales and Use Tax shall commence on the day following the date of expiration of the Prior Tax.
Question One:
There is submitted to the qualified electors of the City of Fayetteville, Arkansas, the question of the issuance of capital improvement bonds in principal amount not to exceed $25,000,000 (the "Wastewater Improvement Bonds") pursuant to Title 14, Chapter 164, Subchapter 3 of the Arkansas Code of 1987 Annotated (the "Local Government Bond Act") for the purpose of financing all or a portion of the costs of acquisition, construction, reconstruction, extension and equipping of certain improvements to the City's wastewater treatment plants, sewerage and related facilities. If the issuance of the Wastewater Improvement Bonds is approved, the Wastewater Improvement Bonds shall be secured by a pledge of and lien upon (i) all of the receipts of the 0.25% Sales and Use Tax and (ii) all of the receipts of the 0.75% Sales and Use Tax, each levied pursuant to the Local Government Bond Act.
Vote on the question by placing an "X" in one of the squares following the question, either for or against:
FOR the issuance of Wastewater Improvement Bonds in principal amount not to exceed $25,000,000 for the purpose of financing all or a portion of the costs of acquisition, construction, reconstruction, extension and equipping of certain improvements to the City's wastewater treatment plants, sewerage and related facilities, including right-of-way acquisition
AGAINST the issuance of Wastewater Improvement Bonds in principal amount not to exceed $25,000,000 for the purpose of financing all or a portion of the costs of acquisition, construction, reconstruction, extension and equipping of certain improvements to the City's wastewater treatment plants, sewerage and related facilities, including right-of-way acquisition ❑
Question Two:
There is submitted to the qualified electors of the City of Fayetteville, Arkansas, the question of the issuance of capital improvement bonds in principal amount not to exceed $17,000,000 (the "Wastewater Improvement/Refunding Bonds") pursuant to the Local Government Bond Act for the purpose of directly financing all or a portion of the costs of acquisition, construction, reconstruction, extension and equipping of certain improvements to the City's wastewater treatment plants, sewerage and related facilities (the "Project") or, alternatively, for the purpose of refunding the City's water and wastewater revenue bonds originally issued to finance all or a portion of the Project. If the issuance of the Wastewater Improvement/Refunding Bonds is approved, the Wastewater Improvement/Refunding Bonds shall be secured by a pledge of and lien upon (i) all of the receipts of the 0.25% Sales and Use Tax and (ii) all of the receipts of the 0.75% Sales and Use Tax, each levied pursuant to the Local Government Bond Act.
Vote on the question by placing an "X" in one of the squares following the question, either for or against:
FOR the issuance of Wastewater Improvement/Refunding Bonds in principal amount not to exceed $17,000,000 for the purpose of financing or refinancing all or a portion of the costs of acquisition, construction, reconstruction, extension and equipping of certain improvements to the City's wastewater treatment plants, sewerage and related facilities, including right-of-way acquisition ❑
AGAINST the issuance of Wastewater Improvement/Refunding Bonds in principal amount not to exceed $17,000,000 for the purpose of financing or refinancing all or a portion of the costs of acquisition, construction, reconstruction, extension and equipping of the improvements to the City's wastewater treatment plants, sewerage and related facilities, including right-of- way acquisition ❑
Question Three:
There is submitted to the qualified electors of the City of Fayetteville, Arkansas, the question of the issuance of capital improvement bonds in principal amount not to exceed $65,900,000 (the "Street Improvement Bonds") pursuant to the Local Government Bond Act for the purpose of financing all or a portion of the costs of acquisition, construction and equipping of certain street improvements. If the issuance of the Street Improvement Bonds is approved, the Street Improvement Bonds shall be secured by a pledge of and lien upon (i) all of the receipts of the 0.25% Sales and Use Tax and (ii) all of the receipts of the 0.75% Sales and Use Tax, each levied pursuant to the Local Government Bond Act.
Vote on the question by placing an "X" in one of the squares following the question, either for or against.
FOR the issuance of Street Improvement Bonds in principal amount not to exceed $65,900,000 for the purpose of financing all or a portion of the costs of acquisition, construction, reconstruction, repair, straightening and widening of certain City streets, which may include related sidewalk, traffic signal and control, curbing, guttering and drainage improvements and right-of-way acquisition .
AGAINST the issuance of Street Improvement Bonds in principal amount not to exceed $65,900,000 for the purpose of financing all or a portion of the costs of acquisition, construction, reconstruction, repair, straightening and widening of certain City streets, which may include related sidewalk, traffic signal and control, curbing, guttering and drainage improvements and right-of-way acquisition
Question Four:
There is submitted to the qualified electors of the City of Fayetteville, Arkansas, the question of the issuance of capital improvement bonds in principal amount not to exceed $2,100,000 (the "Trail Improvement Bonds") pursuant to the Local Government Bond Act for the purpose of financing all or a portion of the costs of acquisition, construction and equipping of certain City trail system improvements. If the issuance of the Trail Improvement Bonds is approved, the Trail Improvement Bonds shall be secured by a pledge of and lien upon (i) all of the receipts of the 0.25% Sales and Use Tax and (ii) all of the receipts of the 0.75% Sales and Use Tax, each levied pursuant to the Local Government Bond Act.
Vote on the question by placing an "X" in one of the squares following the question, either for or against:
FOR the issuance of Trail Improvement Bonds in principal amount not to exceed $2,100,000 for the purpose of financing all or a portion of the costs of acquisition and construction of certain City trail system improvements, which may include related pedestrian signal and drainage improvements and right-of-way acquisition. ❑
AGAINST the issuance of Trail Improvement Bonds in principal amount not to exceed $2,100,000 for the purpose of financing all or a portion of the costs of acquisition and construction of certain City trail system improvements, which may include related pedestrian signal and drainage improvements and right-of-way acquisition.
Section 5. That the election shall be held and conducted and the vote canvassed and the results declared under the law and in the manner now provided for Arkansas municipal elections unless otherwise provided in the Local Government Bond Act, and only qualified voters of the City shall have the right to vote at the election. The City Clerk is hereby directed to give notice of the special election by one advertisement in a newspaper of general circulation within the City, the publication to be not less than ten (10) days prior to the date of the election.
Appendix Number 2: Advantages and Disadvantages of
The proposed West Mount Comfort Relocation
The proposed West Mound Comfort relocation has few advantages and many disadvantages and is dangerous for vehicles, pedestrians and bicycles:
The Proposed West Mount Comfort reconfiguration/relocation to the commercial development lot is bordered by grocery store on the South side, by James Street on the North side and by the current West Mount Comfort/Garland on the East side. See Attachment 1 for an overlay drawing on an aerial photograph of the area local to the commercial development lot.
Advantages:
As far as I can tell there is only one advantage to the proposed relocation/reconfiguration of West Mount Comfort and even so this advantage has built-in dangers.
The advantage: enables a right turn for vehicles traveling South on North Garland bound for West Mount Comfort traffic permitting.
The built-in dangers of this advantage: Vehicles making the above referenced right turn onto West Mount Comfort must navigate a sharp curve to the right around a radius estimated to be in excess of 150 degrees while other vehicles could be entering from James Street on the left and from the nearby businesses on the right. After the vehicle has driven around this challenging curve it is on a reversed trajectory almost parallel to North Garland from which it started.
West Mount Comfort bound vehicles traveling North on North Garland and which speed-up to cross the south flowing traffic and move onto the above proposed challenging sharp right curve will be even more accident prone.
Disadvantages/Illustrations/comments:
The current proposed design extends West Mount Comfort over more than approximately 50% of the eastern half of this commercial development lot in a curve achieving a 90 degree turn into North Garland. This design has several serious flaws:
1) West Mount Comfort traffic will be directed into an intensely busy and congested area of North Garland bordered by many entrances and exits.
The City/State will have missed the opportunity to move West Mount Comfort’s intersection with North Garland to the North: more removed from the intense traffic in the busy section of North Garland.
2) The West Mount Comfort intersection with North Garland does not align with an opposing street entrance. To illustrate: A cautious East bound driver in a vehicle on West Mount Comfort headed East will likely turn right onto North Garland, proceed South on North Garland to the traffic light where North Street intersects North Garland , then turn left, and continue East on North Street. Vehicles traveling this route add congestion to the busy section of North Garland.
Had there been an opposing street entrance directly across from the West Mount Comfort exit onto North Garland along with a stoplight properly timed with the North Street/Wedington intersection with North Garland, the same vehicle could have simply driven across North Garland and proceeded East. The advantages of this West Mount Comfort opposing street configuration are: a) vehicles don’t travel into the busy North Garland area thus reducing North Garland traffic congestion, and
b) Safety: vehicles do not have to make two turns and a lane change in intense traffic on North Garland, to head East.
3) There is no real benefit of the proposed West Mount Comfort configuration for South bound vehicles turning right onto North Garland from West Mount Comfort : compared to the current West Mount comfort configuration at its intersection with North Garland.
· Please see Attachment 1 and note the over-lay drawing of the proposed intersection of West Mount Comfort with North Garland.
· The proposed West Mount Comfort intersection with North Garland is about 150 feet wide.
· Drivers tend to drive along the right side of the road to avoid driving off the road.
· Note that West Mount Comfort sweeps to the right along the curved roadway of the proposed design at the intersection of West Mount Comfort with North Garland.
Now consider South bound drivers who drive along the right side of the curved West Mount Comfort roadway and stop on West Mount Comfort at the intersection of West Mount Comfort with North Garland.
In the Attachment 1, note the position of the current West Mount comfort roadbed at the intersection: drivers will find themselves in the about the same physical location on the proposed West Mount comfort intersection with North Garland as they do now with the current West Mount Comfort intersection with North Garland!
Comparing the proposed West Mount Comfort intersection with North Garland with the current intersection of West Mount Comfort with North Garland , each of these drivers will still have to twist their torso and crane their neck to the left to see the oncoming South bound traffic on North Garland. In this important example there is no redeeming payoff for a) the expense of the proposed reconfiguring of West Mount Comfort and b) damage of the two properties overrun, three if the increased damage to the grocery store’s parking lot is included.
Should the drivers referenced above decide to abandon the right side of the West Mount Comfort and drive to the approximate center of the very wide proposed intersection of West Mount Comfort with North Garland, each driver will have to compete for driving space on North Garland with vehicles departing the liquor store and the gas station (both across from the West Mount Comfort intersection with North Garland): These vehicles will be arbitrarily turning North or South on North Garland. Avoiding these vehicles will be a continual danger for the above drivers, and in turn for those vehicles stacked along the proposed West Mount Comfort reconfiguration.
When turning to the South onto North Garland these West Mount Comfort drivers who stopped at the center of West Mount Comfort will also have to avoid other drivers that had decided to stay to the right on West Mount Comfort instead of moving to the center of the West Mount Comfort intersection with North Garland. These drivers will at the same time have to concentrate on avoiding vehicles leaving the nearby North-most exit from grocery store parking lot.
In the above discussion, the driver has to be concerned that vehicles will randomly compete with him/her for driving space at/near the West Mount Comfort/North Garland intersection.
These competing vehicles can approach the above vehicle from almost any direction: the result of a proposed West Mount Comfort design configuration that endangers drivers in the same ways and in new ways as compared to the current Mount Comfort configuration.
4) The proposed West Mount Comfort design configuration reduces the number of vehicles that can be on James Street waiting to get onto West Mount Comfort. Because of the large number of vehicles in the College Park apartment area with exit/entrance on James Street and those anticipated to be in a another proposed 350 unit development on James Street, this reduction in vehicle stacking distance is an important issue: it is likely that some of the residents on James Street will be unable to exit their driveways because of stacked vehicles on James Street waiting to get onto the proposed West Mount Comfort Road.
5) Crossing the Street from the commercial development lot is dangerous with the proposed West Mount Comfort configuration: With the proposed West Mount Comfort design configuration, bicycle and foot traffic will have a very difficult time crossing from the South West (commercial development lot) side of the West Mount Comfort intersection with Garland Avenue, to the gas station area and liquor store area of Oak Plaza. This traffic to Oak Plaza will have to cross vehicle traffic on West Mount Comfort , five lanes of traffic on the proposed North Garland including vehicles departing the liquor store, the grocery store North Exit, and the gas station: very dangerous!
6) Crossing the Street from the North side of the grocery store parking lot is dangerous with the proposed West Mount configuration: If pedestrian and bicycle traffic chooses to go further South before crossing North Garland, it will have to climb stairs from the commercial development lot level up about 8 feet to the level of the grocery store parking lot: difficult for bicycles and those with disabilities. After moving up to the grocery store parking level: to get to Oak Plaza, foot and bicycle traffic will still have to cross vehicle traffic from the proposed West Mount Comfort , five lanes of traffic on the proposed North Garland including vehicles departing the liquor store, grocery store North Exit, and the gas station: very dangerous!
7) The University bus loads/unloads passengers in this same proposed intersection area: on North Garland at the south side of the proposed West Mount Comfort intersection with North Garland: another danger to foot and bicycle traffic crossing North Garland from this area.
8) High density proposed intersection use from nearby high density apartments: The heavy influx of foot and bicycle traffic from the proposed 350 condominium units at the west end of James , nearby College Park apartments plus the grocery store foot traffic and vehicle traffic on the proposed reconfigured West Mount Comfort and North Garland: means that all of the above will result in a confusing competition for space within the proposed West Mount Comfort /North Garland intersection area: navigating this intersection will be extremely complicated and dangerous.
9) Stoplight for the Proposed West Mount Comfort/North Garland Intersection Could Cause Gridlock
From my discussion with the City and the Arkansas Highway Traffic Division: North Garland is “an uncontrolled access locality”. As explained to me: this means that there is no regulation that specifies minimum distances between stoplights although there may be some guidelines. At the time I enquired on about 7-14-08, the stoplight placement on North Garland hadn’t been specified by the Arkansas Highway and Traffic Department.
The distance from the proposed West Mount Comfort’s intersection with North Garland to the North Street/North Garland intersection is only about 500 feet. A stoplight this close to the North Street/North Garland intersection’s stoplight could gridlock the traffic on North Garland and make the traffic on North Garland and at the North Street/North Garland intersection worse than it is now. This is because of the following:
· red/green timing of the stoplight s at the North Street/North Garland intersection,
· the timing of the stoplight at the proposed West Mount Comfort/North Garland intersection,
· the short distance (small number of vehicles ) that can be accommodated between the two stoplights,
· the entry and exits of vehicles from the businesses between the stoplights,
· the entry and exits of vehicles from the businesses near West Mount Comfort/North Garland intersection stoplight (liquor store and the gas station, and what used to be the barbecue restaurant), and
· traffic intensity
Those listed above are only a few of the variables.
To illustrate gridlock: if the North Street/North Garland stoplight turns red for North Garland and there are a stacked line of cars, say about 50 or more vehicles, stretching from the North Street/North Garland intersection back North through the proposed West Mount Comfort/North Garland intersection and the stoplight at the proposed West Mount Comfort/North Garland intersection turns green when viewed from proposed West Mount Comfort, there will be cars on North Garland blocking the proposed West Mount Comfort entrance to North Garland: gridlock.
Use the “Fayetteville Involvement Meeting “ aerial map only for a general idea of the proposed North Garland widening: I believe that the aerial photo map distributed at the 19 June 2008 Fayetteville Public Involvement Meeting and the yellow overlay drawing were intended only to convey a general idea of the proposed widening of North Garland. This distributed map does not show how the neighborhood yards will be overrun, and how the usefulness of some buildings will be significantly impaired. Even if a building itself is not condemned, the noise level from a close five lane highway will make some buildings very uncomfortable places to be. The map distributed at the Fayetteville Involvement Meeting shows that the proposed West Mount Comfort has all the advantages of a 90 degree intersection with North Garland: a more detailed map (see Attachment 1) indicates that the proposed West Mount Comfort Road has few of these advantages. The Fayetteville Involvement Meeting’s aerial photo overlay map shows that the current West Mount Comfort intersection with North Garland is not part of the proposed reconfiguration of West Mount Comfort intersection with North Garland:
In more detailed drawings (see Attachment 1) almost all of the current intersection of West Mount Comfort with North Garland is contained inside the proposed West Mount Comfort intersection with North Garland.
Note on the more detailed /accurate aerial overlay map of Attachment 1, that a South bound vehicle on North Garland turning West to enter the proposed West Mount Comfort intersection and moving West on the proposed West Mount Comfort will have to turn to the right for an estimated 150+ degrees (almost a full reversal of direction) in the very short time it would take the vehicle to pass James Street. My understanding is that the City of Fayetteville does not approve turns that exceed 135 degrees.
At the same time as the above vehicle driver is turning to the right around the above described difficult curve, the driver will have to be aware of vehicles exiting to the North and South from James, and a large amount of foot traffic and bicycle traffic to James from Oak Plaza and vice versa. In addition, the businesses within the curve, on the right hand of the curve described above (if they survive the North Garland widening process) will have vehicles entering and leaving their premises within the same James Street/proposed West Mount Comfort intersection area and also West bound vehicles from the North and South turning into James Street from the proposed West Mount Comfort, perhaps all occurring at the same time. Again other vehicles, foot traffic and bicycles can intersect the above vehicle from almost any direction!
Even in the best of conditions where all of the vehicle drivers, foot traffic and bicyclers are competent, the dangerous situations described above may be more challenging than some drivers can accommodate.
Appendix 3: A Vision for the Commercial Development Lot
The vision is a research facility linking the University of Arkansas with other research facilities in the State, nation and world with a mission to improve the quality of life for Arkansans and others while contributing to the economic development of the City.
Such a facility would provide local jobs and be a tax revenue source for Fayetteville. Such a facility would also support the new work model: workers living at close proximity to their work locations.
This research facility makes a lot more sense than destroying the commercial development lot property for a badly designed road which funnels traffic into an already intensely traveled North Garland area where vehicles, pedestrians and bicyclers are each in danger.
Should this proposed road over the commercial development lot become a reality, it is anticipated that future or concurrent City/State mandated easements and right-of-way would destroy the usefulness of the remainder of this commercial development lot. Thus, the local neighborhood could be encumbered with a lot full of unattractive utility facilities, access covers and panels, antennas, etc.
Appendix 4: Proposed West Mount Comfort to Overrun 1107 James Street Front Yard:
1107 James Street is at the corner of James Street and the current West Mount Comfort. This house is located North across James Street from the commercial development lot (which is itself the lot North of the grocery store).
Land taken from the front yard of 1107 James is being used in the proposed reconfiguration of West Mount Comfort and thus enables its dangerous intersections with North Garland and James: See Attachment 1 to view how 1107 James is being used for the proposed reconfiguration.
It is bad enough to have property condemned and taken away for a just and noble reason: for some reason that truly helps people. It is humiliating and disgraceful to be forced to provide property for a purpose that will harm local individuals, disabled individuals, foot traffic, bicyclers and drivers attempting to travel on and or across the proposed reconfiguration of West Mount Comfort and its proposed intersection with North Garland, and its intersection with James Street.
Detail about 1107 James Street……
At the Fayetteville Public Involvement Hearing on June 19, 2008, I voiced concern that the proposed West Mount Comfort would be elevated above what would remain of the front yard at 1107 James Street. The concern was about flooding because the proposed West Mount Comfort will block the normal drainage of 1107 James Street house and yard. During heavy rain, water could back up in the yard and damage the house.
One of the state’s engineers said that was the reason that a storm drain would be placed in the front yard. Of course someone will have to maintain and clear this storm drain. Leaves and yard waste could be a problem if the trees are not cut down both on this property and on the neighbor’s property: leaves in a combination with other yard waste will clog most grated drains. Miscellaneous debris is on many occasions discarded in this area and could easily clog a drain.
Keeping this drain functional will be a continuing expense, and if the drain clogs, 1107 James and perhaps other local houses may suffer damage.
It is possible that many front yards along North Garland could face these same kinds of drainage problems if the proposed 5 lane highway is constructed.
Appendix Number 5: Wild Speculations about the future of the North Garland Area
Trying to understand the present by looking ahead to what might be the eventual goals/objectives of the proposed changes to North Garland and West Mount Comfort:
Why is North Garland Avenue proposed for widening: West Mount Comfort proposed for reconfiguration? We have to ask ourselves why the proposed plan severely damages businesses and households along North Garland Avenue. Is it simply that the University needs more stacking space for vehicles? Are there other compelling reasons for the proposed widening of North Garland?
Is this proposed plan only the beginning?
Consider the proposed reconfiguration of West Mount Comfort Road. My understanding of city street engineering and good practice from those with professional experience indicates that streets should line up with each other: that is, West Mount Comfort if reconfigured should line up with another street like for example the nearby Holly Street. The City of Fayetteville has some pride in developing an effective grid structure within the city.
The proposed reconfigured West Mount Comfort does not line up with another street: Why not?
Well, perhaps the proposed West Mount Comfort lines-up with a street which is yet to be built. We could imagine where such a new street might be constructed by sighting East from the entrance of the proposed West Mount Comfort intersection with North Garland. Doing so, we could imagine that a new street could be extended East to line-up with the current section of the proposed West Holly that runs between Oakland and Leverett.
Such carving-up of the local area might damage it so much that it could be bought cheaply and used for another purpose: University parking, convention center, Wal-Mart, hotel, you name it…
Why carve up Garland Avenue household property at the same time? A possible reason is that the entire .75 mile section of North Garland is targeted for reconfiguration and commercialization: after people have moved away or given-up hope.
As noted earlier, the proposed West Mount Comfort intersection with North Garland Avenue is about 150 feet wide. Planners know that intersections are expensive to build. In this speculation, if the planners have made the proposed intersection 150 feet wide, it signals that the current West Mount Comfort is eventually to be planned as a four lane road. This future West Mount Comfort four lane road could be another conduit form the West to whatever is planned for the local North Garland area: University parking facilities, convention center, Wal-Mart, you name it….
If this future West Mount Comfort four lane road were to cross from the North Garland area to Leverett that would fuel a speculation that Leverett would become a four lane highway sometime in the future.
Is this speculation believable? What gives this speculation credence is:
1) The first evidence of credibility: the proposed reconfiguration of West Mount Comfort does not line-up with an opposing street.
2) A second evidence of credibility for this speculation is that the proposed reconfiguration of West Mount Comfort is dangerous to the traveling public and to bicycles and pedestrians. If public safety were the objective in the proposed reconfiguration of West Mount Comfort, the intersection of West Mount Comfort would have been moved further North and lined-up with an opposing street such as Holly, or even further North on North Garland. If public safety is not the key objective for the proposed West Mount Comfort reconfiguration, then there could be a hidden agenda.
3) The third evidence of credibility: The approximate three to one mismatch of the traffic carrying capacity of the entrance to the University (South Garland) with the three roads feeding it (North Garland, North Street, Wedington) means that widening North Garland would not be very helpful for getting traffic into the to the University quickly.
Thus it is reasonable to suspect that there is another reason for the proposed widening of West Garland Avenue: a widened North Garland Avenue would be useful for feeding traffic to the North Garland area for whatever is to be constructed there in the future. A residential North Garland which has been damaged/destroyed by a 5 lane highway across it would be ripe for commercial development.
Fayetteville Transportation Improvement Program
Reference Operations Director’s letter to the City Council dated June 7, 2006
See next image
Attachment 1: Proposed West Mount Comfort
See next image
Attachment 2: Highway 112 Spur-North, Excerpt of the Preliminary Construction Plans from the Arkansas Highway and Transportation Department
See next image
Wislon©2008 Unlimited number of copies authorized for distribution.
Friday, August 15, 2008
Wednesday, August 13, 2008
NO COAL meeting Wednesday August 13th 7pm
Molly Rawn
OHG Sierra Club, Chair
(479) 879-1620
---------- Forwarded message ----------
From: James Burke
Date: Mon, Aug 11, 2008 at 6:05 PM
Subject: Important NO COAL meeting Wednesday August 13th 7pm
To: burke@ecoconservation.org
Hi everyone,
We had a successful tour traveling the state last week showing the documentary "Fighting Goliath" and talking with community groups about forming a no new coal coalition. Check out these links for an update:
http://arkansasmatters.com/content/fulltext/news/?cid=96901
http://www.nwaonline.net/articles/2008/08/04/news/080508fzlibmov.txt
So far we have set up 'Clean Air Arkansas' groups in Fayetteville, Little Rock, Conway, and Hope to oppose the construction of new coal-fired power plants.
This Wednesday August 13th at 7pm we will meet in Fayetteville to discuss in more detail our campaign and delegate roles to people who are committed to this effort. Please join us and invite your friends and family. Time is running out and we need to come together to stop these coal plants
Here is the address for the meeting this Wednesday:
United Campus Ministry
Omni Center
902 W Maple St
Fayetteville, AR
Also, Maggie Bailey, a volunteer in Fayetteville has asked to coordinate events while I am in Little Rock so you can email either her or me for more questions about our campaign. Here is Maggie's email: mtucker22@yahoo.com
Hope to see you at the meeting. Thanks for your support.
James
burke@ecoconservation.org
www.ecoconservation.org
336-455-1065
OHG Sierra Club, Chair
(479) 879-1620
---------- Forwarded message ----------
From: James Burke
Date: Mon, Aug 11, 2008 at 6:05 PM
Subject: Important NO COAL meeting Wednesday August 13th 7pm
To: burke@ecoconservation.org
Hi everyone,
We had a successful tour traveling the state last week showing the documentary "Fighting Goliath" and talking with community groups about forming a no new coal coalition. Check out these links for an update:
http://arkansasmatters.com/content/fulltext/news/?cid=96901
http://www.nwaonline.net/articles/2008/08/04/news/080508fzlibmov.txt
So far we have set up 'Clean Air Arkansas' groups in Fayetteville, Little Rock, Conway, and Hope to oppose the construction of new coal-fired power plants.
This Wednesday August 13th at 7pm we will meet in Fayetteville to discuss in more detail our campaign and delegate roles to people who are committed to this effort. Please join us and invite your friends and family. Time is running out and we need to come together to stop these coal plants
Here is the address for the meeting this Wednesday:
United Campus Ministry
Omni Center
902 W Maple St
Fayetteville, AR
Also, Maggie Bailey, a volunteer in Fayetteville has asked to coordinate events while I am in Little Rock so you can email either her or me for more questions about our campaign. Here is Maggie's email: mtucker22@yahoo.com
Hope to see you at the meeting. Thanks for your support.
James
burke@ecoconservation.org
www.ecoconservation.org
336-455-1065
Monday, August 11, 2008
Fran Alexander's Northwest Arkansas Times column urges governor to persuade commission to use gas money for habitat preservation, restoration
CROSS CURRENTS : Frack II
Fran Alexander frana@nwarktimes.com
Posted on Monday, August 11, 2008
URL: http://www.nwanews.com/nwat/Editorial/68004
“Anyone who can solve the problems of water will be worthy of two Nobel prizes — one for peace and one for science.” — John F. Kennedy If you read my July 28 article “Frack, rattle, and roll,” about the Fayetteville Shale gas drilling, you know that all that glitters is not necessarily pure gold. In the case of natural gas being released from “fracked” shale strata under several counties in central Arkansas, the big money being made there is awash with serious costs as well. Politicians blinded by the prospect of billions glutting the state economy have generally ignored these costs. So far, none of the money to be garnered from a severance tax on the gas bonanza or from leases has been specifically earmarked for environmental protection costs.
We often read about green issues with a lulled feeling of security that the network of laws and regulations in our country will protect us individually and collectively from dire ecological and financial consequences. It’s time to burst that bubble. Federal oil and gas production exemptions abound to the point that one is left feeling we are living on a wild, lawless frontier where random bullets of enviro horrors whiz by our heads daily. (See: www. earthworksaction. org / pubs / PetroleumExemptions 1 c. pdf ) Most citizens are also on their own financially when dealing with leases, taxes and the complicated jungle of resource prospectors. It seems even the state is not too sure what is in its best interests in regard to resources like oil, gas, bromide, coal or money, and is being especially slow in comprehending what is happening to its water, truly our most valuable resource.
Since my last article, a whole new wrinkle about gas drilling has slithered into the news. Neither the general public nor most of the state’s major environmental organizations (Audubon, Arkansas Wildlife Federation, Sierra Club ) were asked for any input before the Arkansas Game and Fish Commission signed two gas leases. One lease covers 7, 579 mineral acres and 15, 500 surface acres in the Petit Jean River Wildlife Management Area near Ola, in Yell County; the other for 3, 949 mineral acres and 11, 683 surface acres in the Gulf Mountain Wildlife Management Area in Van Buren County. Chesapeake Energy Corp. is parting with $ 29. 5 million and a 20 percent royalty interest to get to drill in these public lands.
Keep in mind that land surface (and therefore, habitat) is severely affected where cleared drilling pads, which range from one to five acres in size, are located, and by many miles of roads needing to be improved, expanded, or built for the hundreds of truck trips servicing drilling sites. Compressors hum loudly day and night, so noise can be a problem for humans and animals. And major impacts from pipeline rights of way, which can vary from 20 to 50 feet in width, occur because their pathways denude vast swaths of land. Many people do not realize that mineral leasing confers dominant use of the surface for extraction of underground minerals, no matter who owns the surface or whether they want drilling on their land or not. But on public lands the public should at least have been asked.
“What are we thinking?” is pretty much the question that environmentalists, snugly wrapped in our straitjackets, mutter to ourselves as we rock back and forth banging our heads into walls. I ended my last article asking, “Will we do anything about this situation?” meaning will we find a way to get at least some of the tax revenue from this gas production directed into preventing and repairing the environmental harm that will affect Arkansas’ land, air, water and human health? The Arkansas Game and Fish Commission’s leasing has provided a whole new pot o’ gold for grasping, and the commission and the governor are having somewhat of a standoff over who gets to decide how this wealth will be spent.
The commission says the money is theirs to direct to wildlife. Sounds good unless that “wildlife” includes trucks, salaries, buildings, game wardens, hunting programs, equipment, etc. for humans. It needs to be directed to habitat protection and repair, the essence of what could be harmed by drilling activities. The money could also go a long way in establishing methods to protect watersheds with conservation easements, thereby expanding preservation all over the state, not just within boundaries of management areas. Obviously, those borders have just been proven not to be sacrosanct when money rides into town.
The League of Women Voters has done extensive study on the Fayetteville Shale Play, taken tours to the drilling sites and in January co-hosted a forum on the issue with the Sierra Club. Mary Alice Serafini, state president of the League, said they have developed Consensus Positions, which they hope the state Legislature will adopt.
Position 1 is the recommendation that a single water authority be established to coordinate the use and regulation of the state’s public waters.
Position 2 recommends funding for oversight and inspection so that problems can be addressed before damage occurs instead of being only complaint driven.
Position 3 provides greater protection of landowners’ surface rights and of waterways.
Position 4 provides full disclosure of chemical additives being used in drilling and production activities that might infiltrate groundwater or pollute the air. (This is a “right-to-know” issue for anyone who otherwise might be exposed to harmful contaminants.)
Position 5 promotes the establishment of a fund for infrastructure changes and damages in areas affected by gas drilling.
So the League has been willing to do something. I hope you will too by contacting our legislators to tell them to support environmental protection and positions such as the League has taken. Immediately, however, we need to contact Gov. Mike Beebe and let him know we consider resource revenue the property of the citizens of Arkansas, and that the public’s money should go toward protecting our state for all of us, not just those with gas.
Fran Alexander is a local resident and an active environmentalist.
Copyright © 2001-2008 Arkansas Democrat-Gazette, Inc. All rights reserved. Contact: webmaster@nwanews.com
Waste Management to Dedicate Arkansasʼ First Landfill-Gas-to-Energy Plant
WASTE MANAGEMENT NEWS RELEASE
Waste Management to Dedicate Arkansasʼ First Landfill Gas to Energy Plant and
Announce New Partnership with Audubon Arkansas
Senator Blanche Lincoln, Governor Mike Beebe and Congressman Vic Snyder Scheduled to Attend Event
State and local leaders will join Waste Management executives on Tuesday, August 12, 9:30 am at the Two Pine Landfill to officially dedicate Arkansasʼ first and only landfill gas-to-energy plant. This plant is part of Waste Managementʼs sustainable commitment to Arkansas as well as North America, unveiled this past October as part of Waste Managementʼs 2020 plan.
Additionally, Waste Management officials will announce a new first-of-its-kind partnership with Audubon Arkansas.
What: Landfill Gas to Energy Plant Dedication and Announcement of New Partnership with Audubon Arkansas
When: Tuesday, August 12 at 9:30 am
Where: Two Pine Landfill
100 Two Pine Drive
North Little Rock, AR 72117
Who: Senator Blanche Lincoln
Governor Mike Beebe
Congressman Vic Snyder
Waste Management Executives
Arkansas Audubon Director Ken Smith
The Two Pine Landfill gas-to-energy plant is a 4.8 megawatt facility, providing power for approximately 4,500 homes in North Little Rock. Consisting of six large engines, it was constructed in 2006 and recently achieved full generation. The engines are powered by methane gas, which forms in the landfill as a result of the decomposition of waste.
Approximately two years ago, Waste Management and Audubon Arkansas began discussions regarding the development of a wildlife management plan for the Two Pine Landfill. This first-of-its-kind program between Waste Management and Audubon Arkansas has the potential to expand to other Waste Management landfills. At Tuesdayʼs event, Waste Management officials and leaders from Audubon Arkansas will unveil the vision for Two Pine Landfill.
This past April, Waste Management received the stateʼs approval to expand the Two Pine Landfill. In the coming years, Waste Management plans to build an additional landfill gas-to-energy plant in the expanded landfill area.
These two projects are part of the companyʼs environmental sustainability initiative. Waste Management has committed to the following actions by 2020: doubling its waste based energy generation from the equivalent of generating enough energy for one million to two million homes, quadrupling the number of its sites certified by the Wildlife Habitat Council to 100 as well as set aside 25,000 acres for conservation, nearly tripling the amount of recyclables it manages to 20 million tons; and reducing its vehicle fleet emissions by 15 percent and increasing fuel efficiency by 15 percent.
Waste Management, based in Houston, Texas, is the leading provider of comprehensive waste management services in North America. Our subsidiaries provide collection, transfer, recycling and resource recovery, and disposal services. We are also a leading developer, operator and owner of waste-to-energy and landfill gas-to-energy facilities in the United States. Our customers include residential, commercial, industrial, and municipal customers throughout North America.
For more information, visit www.wm.com or www.thinkgreen.com
Waste Management to Dedicate Arkansasʼ First Landfill Gas to Energy Plant and
Announce New Partnership with Audubon Arkansas
Senator Blanche Lincoln, Governor Mike Beebe and Congressman Vic Snyder Scheduled to Attend Event
State and local leaders will join Waste Management executives on Tuesday, August 12, 9:30 am at the Two Pine Landfill to officially dedicate Arkansasʼ first and only landfill gas-to-energy plant. This plant is part of Waste Managementʼs sustainable commitment to Arkansas as well as North America, unveiled this past October as part of Waste Managementʼs 2020 plan.
Additionally, Waste Management officials will announce a new first-of-its-kind partnership with Audubon Arkansas.
What: Landfill Gas to Energy Plant Dedication and Announcement of New Partnership with Audubon Arkansas
When: Tuesday, August 12 at 9:30 am
Where: Two Pine Landfill
100 Two Pine Drive
North Little Rock, AR 72117
Who: Senator Blanche Lincoln
Governor Mike Beebe
Congressman Vic Snyder
Waste Management Executives
Arkansas Audubon Director Ken Smith
The Two Pine Landfill gas-to-energy plant is a 4.8 megawatt facility, providing power for approximately 4,500 homes in North Little Rock. Consisting of six large engines, it was constructed in 2006 and recently achieved full generation. The engines are powered by methane gas, which forms in the landfill as a result of the decomposition of waste.
Approximately two years ago, Waste Management and Audubon Arkansas began discussions regarding the development of a wildlife management plan for the Two Pine Landfill. This first-of-its-kind program between Waste Management and Audubon Arkansas has the potential to expand to other Waste Management landfills. At Tuesdayʼs event, Waste Management officials and leaders from Audubon Arkansas will unveil the vision for Two Pine Landfill.
This past April, Waste Management received the stateʼs approval to expand the Two Pine Landfill. In the coming years, Waste Management plans to build an additional landfill gas-to-energy plant in the expanded landfill area.
These two projects are part of the companyʼs environmental sustainability initiative. Waste Management has committed to the following actions by 2020: doubling its waste based energy generation from the equivalent of generating enough energy for one million to two million homes, quadrupling the number of its sites certified by the Wildlife Habitat Council to 100 as well as set aside 25,000 acres for conservation, nearly tripling the amount of recyclables it manages to 20 million tons; and reducing its vehicle fleet emissions by 15 percent and increasing fuel efficiency by 15 percent.
Waste Management, based in Houston, Texas, is the leading provider of comprehensive waste management services in North America. Our subsidiaries provide collection, transfer, recycling and resource recovery, and disposal services. We are also a leading developer, operator and owner of waste-to-energy and landfill gas-to-energy facilities in the United States. Our customers include residential, commercial, industrial, and municipal customers throughout North America.
For more information, visit www.wm.com or www.thinkgreen.com
Sunday, August 10, 2008
Monarch butterflies visit World Peace Wetland Prairie to lay eggs on milkweed so that caterpillars can eat and grow
Sunday, August 3, 2008
Miller Williams endorses Lioneld Jordan for mayor, again
Fayetteville’s best choice
As citizens of Ward 4 during Lioneld Jordan’s full tenure as our alderman, my wife and I have come to trust and respect him without hesitation. We are increasingly impressed by his knowledge of our town and region’s history and his insights into our current needs and possibilities. Our T-shirts and lapel pins say that we support him in the mayor’s race, but we wanted to say so more clearly and to the whole town.
Miller Williams
Fayetteville
Bill Moeller endorses Lioneld Jordan for mayor
What you see is what you get
Last night at our monthly Ward 4 meeting I was reminded again of one of the big reasons I am supporting Lioneld Jordan in his campaign for mayor: He believes in informing the people, and he knows how to listen.
During his seven years as alderman, Lioneld has held monthly Ward 4 meetings at City Hall. He brings everyone up to date on business before the City Council, introduces one or more speakers from the city staff or the business community who bring us up to date on project status and proposed projects, and then calls for an open discussion of issues anyone wants to discuss.
He listens. He does not promise to do what we say, but he does promise that we will have our say. More often than not we all (including Lioneld ) reach a consensus which he carries forward to the City Council as our representative. On those occasions where he does not agree, he explains his reasoning clearly and we know exactly where he stands.
There are no surprises. With Lioneld, what you see is what you get. As mayor of Fayetteville he will continue to meet with the people, he will continue to listen, he will continue to tell it like it is, and he will continue to make informed decisions based on all available information.
Please remember in November: Lioneld Jordan — Experience You Can Trust !
William A. Moeller
Fayetteville
Last night at our monthly Ward 4 meeting I was reminded again of one of the big reasons I am supporting Lioneld Jordan in his campaign for mayor: He believes in informing the people, and he knows how to listen.
During his seven years as alderman, Lioneld has held monthly Ward 4 meetings at City Hall. He brings everyone up to date on business before the City Council, introduces one or more speakers from the city staff or the business community who bring us up to date on project status and proposed projects, and then calls for an open discussion of issues anyone wants to discuss.
He listens. He does not promise to do what we say, but he does promise that we will have our say. More often than not we all (including Lioneld ) reach a consensus which he carries forward to the City Council as our representative. On those occasions where he does not agree, he explains his reasoning clearly and we know exactly where he stands.
There are no surprises. With Lioneld, what you see is what you get. As mayor of Fayetteville he will continue to meet with the people, he will continue to listen, he will continue to tell it like it is, and he will continue to make informed decisions based on all available information.
Please remember in November: Lioneld Jordan — Experience You Can Trust !
William A. Moeller
Fayetteville
Thursday, July 24, 2008
Build a rain barrel, help reduce erosion downstream and water plants free
Beaver Water District To Conduct Rain Barrel Building
Workshops July 26th at Fayetteville Farmers Market
For immediate release: July 15, 2008
Beaver Water District will conduct three rain barrel building workshops at 9:30 a.m., 10:30 a.m., and 11:30 a.m. on Saturday, July 26th, at the Fayetteville Farmer's Market on the downtown square in Fayetteville. Those participating will learn how to build a rain barrel and leave with step-by-step instructions. Additionally, barrels built that day will be given away in a drawing to those who attend. Rain barrels are a water conservation tool. Positioned under a gutter of a home, a rain barrel will capture runoff during rain events. Water may then be used to water the lawn and flowers. For more information, e-mail Amy Wilson, Director of Public Affairs for Beaver Water District at awilson@bwdh2o.org.
Audubon Arkansas also will be on the Fayetteville Square that day with a stream table conducting demonstrations showing how erosion occurs in a watershed setting and how this impacts the watershed and receiving streams and lakes. Audubon is dedicated to protecting birds and other wildlife and the habitat that supports them. Beaver Water District’ s mission is to serve our customers in the Benton and Washington County area by providing high quality drinking water that meets or exceeds all federal and state regulatory requirements in such quantities as meets their demands and is economically priced consistent with our quality standards. For more information, visit www.bwdh2o.org.
Amy L. Wilson, Director of Public Affairs
Beaver Water District, P.O. Box 400, Lowell, AR 72745
awilson@bwdh2o.org; 479-756-3651
“Anyone who can solve the problems of water will be worthy of two Nobel prizes – one for peace and one for science.” -- John F. Kennedy
Workshops July 26th at Fayetteville Farmers Market
For immediate release: July 15, 2008
Beaver Water District will conduct three rain barrel building workshops at 9:30 a.m., 10:30 a.m., and 11:30 a.m. on Saturday, July 26th, at the Fayetteville Farmer's Market on the downtown square in Fayetteville. Those participating will learn how to build a rain barrel and leave with step-by-step instructions. Additionally, barrels built that day will be given away in a drawing to those who attend. Rain barrels are a water conservation tool. Positioned under a gutter of a home, a rain barrel will capture runoff during rain events. Water may then be used to water the lawn and flowers. For more information, e-mail Amy Wilson, Director of Public Affairs for Beaver Water District at awilson@bwdh2o.org.
Audubon Arkansas also will be on the Fayetteville Square that day with a stream table conducting demonstrations showing how erosion occurs in a watershed setting and how this impacts the watershed and receiving streams and lakes. Audubon is dedicated to protecting birds and other wildlife and the habitat that supports them. Beaver Water District’ s mission is to serve our customers in the Benton and Washington County area by providing high quality drinking water that meets or exceeds all federal and state regulatory requirements in such quantities as meets their demands and is economically priced consistent with our quality standards. For more information, visit www.bwdh2o.org.
Amy L. Wilson, Director of Public Affairs
Beaver Water District, P.O. Box 400, Lowell, AR 72745
awilson@bwdh2o.org; 479-756-3651
“Anyone who can solve the problems of water will be worthy of two Nobel prizes – one for peace and one for science.” -- John F. Kennedy
Wednesday, July 23, 2008
Letters supporting grants to build trails in Arkansas needed NOW!
From: Terry Eastin teastin@lynks.com
Date: July 23, 2008 7:43:08 PM CDT
Subject: Arkansas Trail Fund - last request for letters
Everyone -
Thank you so much for your support of the trail legislation initiative! We are 87 letters strong as of today, July 23rd. A significant number of the mayors of Arkansas' largest cities and many smaller towns have sent well-crafted letters indicating their support for economic, health, and conservation reasons. Many organizations, including those one might not expect (economic and health arenas), have also given this initiative their support. Even more of you individually took the time to share your thoughts and send your letters.
This is the last post I will send requesting letters. The deadline was extended to August 1st last week, but, if letters come in shortly after the deadline, they will be accepted until the packet is finalized. I am expecting the count to extend 100 letters.
Once the project is completed, I send a report to all who helped.
Thank you very much, and please forward this last message. Again, if you have questions, please feel free to contact me at teastin@lynks.com, or by phone at 479-236-0938.
Regards,
Terry Eastin
Co-Chair, 2008 National Trails Symposium
All,
Please distribute the letter below and both attachments to every organization news outlet, email network, agency, mayor, city council, county judge, and trail enthusiast you know. If trail enthusiasts want to see an Arkansas Trails Fund established in the 2009 legislative season, NOW is the time to act! The response date has been extended to August 1, so, please help move this project forward with your letters to me either by email or regular mail. If you have questions, please feel free to contact. We are over half way to our goal of 100+ letters.
Attached is a letter from me explaining the project, a report prepared for the Legislative Committee on Agriculture, Economics, and Forestry, as well as, an Arkansas trail funding summary that illustrates the strong demand for our current minimal trail grant resources.
Even if you have already sent a letter yourself, please forward this request to other trail friends and enthusiasts. Your voices will be heard.
My address is
858 N. Jackson Drive
Fayetteville, AR 72701
teastin@lynks.com
terry@mississippirivertrail.org
Best Regards,
Terry Eastin
Date: July 23, 2008 7:43:08 PM CDT
Subject: Arkansas Trail Fund - last request for letters
Everyone -
Thank you so much for your support of the trail legislation initiative! We are 87 letters strong as of today, July 23rd. A significant number of the mayors of Arkansas' largest cities and many smaller towns have sent well-crafted letters indicating their support for economic, health, and conservation reasons. Many organizations, including those one might not expect (economic and health arenas), have also given this initiative their support. Even more of you individually took the time to share your thoughts and send your letters.
This is the last post I will send requesting letters. The deadline was extended to August 1st last week, but, if letters come in shortly after the deadline, they will be accepted until the packet is finalized. I am expecting the count to extend 100 letters.
Once the project is completed, I send a report to all who helped.
Thank you very much, and please forward this last message. Again, if you have questions, please feel free to contact me at teastin@lynks.com, or by phone at 479-236-0938.
Regards,
Terry Eastin
Co-Chair, 2008 National Trails Symposium
All,
Please distribute the letter below and both attachments to every organization news outlet, email network, agency, mayor, city council, county judge, and trail enthusiast you know. If trail enthusiasts want to see an Arkansas Trails Fund established in the 2009 legislative season, NOW is the time to act! The response date has been extended to August 1, so, please help move this project forward with your letters to me either by email or regular mail. If you have questions, please feel free to contact. We are over half way to our goal of 100+ letters.
Attached is a letter from me explaining the project, a report prepared for the Legislative Committee on Agriculture, Economics, and Forestry, as well as, an Arkansas trail funding summary that illustrates the strong demand for our current minimal trail grant resources.
Even if you have already sent a letter yourself, please forward this request to other trail friends and enthusiasts. Your voices will be heard.
My address is
858 N. Jackson Drive
Fayetteville, AR 72701
teastin@lynks.com
terry@mississippirivertrail.org
Best Regards,
Terry Eastin
Tuesday, July 15, 2008
Policy and Procedures committee meeting running on City 16 tonight
The second meeting of the Telecom board's subcommittee held on Monday afternoon July 14, 2008, was shown after 4 p.m. Tuesday (today) and is to be run again at midnight TONIGHT (Tuesday into Wednesday) and again at 7 a.m. Thursday and at 11:30 p.m. Saturday, July 19, 2008.
Thursday, July 10, 2008
American basket flower (Centaurea Americana) blooming on World Peace Wetland Prairie and other unmowed places throughout northwest Arkansas
Please click on image to ENLARGE photo of American basketflower made on July 10, 2008.

American basketflower photos and description˜
American basketflower photos and description˜
Wednesday, July 9, 2008
Government protection of wetland pathetic
EPA Enforcement Is Faulted
Agency Official Cites Narrow Reading of Clean Water Act
By Juliet Eilperin Washington Post Staff Writer Tuesday, July 8, 2008; A06
An official administration guidance document on wetland policy is undermining enforcement of the Clean Water Act, said a March 4 memo written by the Environmental Protection Agency's chief enforcement officer.
The memo by Granta Y. Nakayama, EPA's assistant administrator for enforcement and compliance assurance, was obtained by the advocacy group Greenpeace and released yesterday by two House Democratic committee chairmen. It highlights the confusion that has afflicted federal wetland protections since a 2006 Supreme Court decision.
That 5 to 4 decision, known as Rapanos v. United States, held that the Army Corps of Engineers had exceeded its authority when it denied two Michigan developers permits to build on wetland, but the court split on where the Corps should have drawn the line on what areas deserve protection.
A plurality made of up Chief Justice John G. Roberts Jr. and Justices Antonin Scalia, Clarence Thomas and Samuel A. Alito Jr. proposed an across-the-board reduction in the Corps' regulatory role, but Justice Anthony M. Kennedy -- who cast the deciding vote -- called for a case-by-case approach in deciding how the government should proceed. That left the ruling open to interpretation.
In his memo to Benjamin Grumbles, EPA's assistant administrator for water, Nakayama wrote that the document the agency issued in June 2007 to guide regulators' decisions under the Rapanos decision is having "a significant impact on enforcement." Nakayama and his staff concluded that between July 2006 and December 2007, EPA's regional offices had decided not to pursue potential Clean Water Act violations in 304 cases "because of jurisdictional uncertainty."
Much of the controversy centers on what sort of waterway and accompanying wetland should qualify for protection. The administration's guidance instructs federal officials to focus on the "relevant reach" of a tributary, which translates into a single segment of a stream. In the memo, Nakayama argued that this definition "isolates the small tributary" and "ignores longstanding scientific ecosystem and watershed protection principles critical to meeting the goals" of the Clean Water Act.
Chairmen Henry A. Waxman (D-Calif.) of the House Government Oversight and Reform Committee and James L. Oberstar (D-Minn.) of the Transportation and Infrastructure Committee sent a letter yesterday to EPA Administrator Stephen L. Johnson saying they have "grave concerns" about the way the agency is implementing the Clean Water Act.
The two noted that Nakayama concluded that in all, the Supreme Court decision and the subsequent guidance document "negatively affected approximately 500 enforcement cases" in nine months. They also questioned why EPA's Grumbles did not raise the issue when he testified before Oberstar's panel less than three months ago.
"This sudden reduction in enforcement activity will undermine the implementation of the Clean Water Act and adversely affect EPA's responsibility to protect the nation's waters," the congressmen wrote. "Yet instead of sounding the alarm about EPA's enforcement problems, the agency's public statements have minimized the impact of the Rapanos decision."
In response to a question about the congressional inquiry, EPA spokesman Jonathan Shradar said in an e-mail: "We will be reviewing the new request and will work with the chairmen to provide information on our enforcement program."
Eric Schaeffer, who used to head EPA's civil enforcement division and now heads the Environmental Integrity Project, an advocacy group, called Nakayama's memo "very significant. It lays out very clearly why you can't enforce one of the most important parts of the Clean Water Act."
EPA officials are not the only ones growing frustrated with the confusing legal interpretations of the Rapanos decision. Robert B. Propst, a senior judge on the U.S. District Court for the Northern District of Alabama, Southern Division, wrote in a Nov. 7, 2007, decision that he was reassigning a wetland case "to another judge for trial. At least one of the reasons is that I am so perplexed by the way the law applicable to this case has developed that it would be inappropriate for me to try it again."
© 2008 The Washington Post Company
Stormwater Management Total Stormwater Management Service Design, Repair & Maintenance www.apexcos.com
Agency Official Cites Narrow Reading of Clean Water Act
By Juliet Eilperin Washington Post Staff Writer Tuesday, July 8, 2008; A06
An official administration guidance document on wetland policy is undermining enforcement of the Clean Water Act, said a March 4 memo written by the Environmental Protection Agency's chief enforcement officer.
The memo by Granta Y. Nakayama, EPA's assistant administrator for enforcement and compliance assurance, was obtained by the advocacy group Greenpeace and released yesterday by two House Democratic committee chairmen. It highlights the confusion that has afflicted federal wetland protections since a 2006 Supreme Court decision.
That 5 to 4 decision, known as Rapanos v. United States, held that the Army Corps of Engineers had exceeded its authority when it denied two Michigan developers permits to build on wetland, but the court split on where the Corps should have drawn the line on what areas deserve protection.
A plurality made of up Chief Justice John G. Roberts Jr. and Justices Antonin Scalia, Clarence Thomas and Samuel A. Alito Jr. proposed an across-the-board reduction in the Corps' regulatory role, but Justice Anthony M. Kennedy -- who cast the deciding vote -- called for a case-by-case approach in deciding how the government should proceed. That left the ruling open to interpretation.
In his memo to Benjamin Grumbles, EPA's assistant administrator for water, Nakayama wrote that the document the agency issued in June 2007 to guide regulators' decisions under the Rapanos decision is having "a significant impact on enforcement." Nakayama and his staff concluded that between July 2006 and December 2007, EPA's regional offices had decided not to pursue potential Clean Water Act violations in 304 cases "because of jurisdictional uncertainty."
Much of the controversy centers on what sort of waterway and accompanying wetland should qualify for protection. The administration's guidance instructs federal officials to focus on the "relevant reach" of a tributary, which translates into a single segment of a stream. In the memo, Nakayama argued that this definition "isolates the small tributary" and "ignores longstanding scientific ecosystem and watershed protection principles critical to meeting the goals" of the Clean Water Act.
Chairmen Henry A. Waxman (D-Calif.) of the House Government Oversight and Reform Committee and James L. Oberstar (D-Minn.) of the Transportation and Infrastructure Committee sent a letter yesterday to EPA Administrator Stephen L. Johnson saying they have "grave concerns" about the way the agency is implementing the Clean Water Act.
The two noted that Nakayama concluded that in all, the Supreme Court decision and the subsequent guidance document "negatively affected approximately 500 enforcement cases" in nine months. They also questioned why EPA's Grumbles did not raise the issue when he testified before Oberstar's panel less than three months ago.
"This sudden reduction in enforcement activity will undermine the implementation of the Clean Water Act and adversely affect EPA's responsibility to protect the nation's waters," the congressmen wrote. "Yet instead of sounding the alarm about EPA's enforcement problems, the agency's public statements have minimized the impact of the Rapanos decision."
In response to a question about the congressional inquiry, EPA spokesman Jonathan Shradar said in an e-mail: "We will be reviewing the new request and will work with the chairmen to provide information on our enforcement program."
Eric Schaeffer, who used to head EPA's civil enforcement division and now heads the Environmental Integrity Project, an advocacy group, called Nakayama's memo "very significant. It lays out very clearly why you can't enforce one of the most important parts of the Clean Water Act."
EPA officials are not the only ones growing frustrated with the confusing legal interpretations of the Rapanos decision. Robert B. Propst, a senior judge on the U.S. District Court for the Northern District of Alabama, Southern Division, wrote in a Nov. 7, 2007, decision that he was reassigning a wetland case "to another judge for trial. At least one of the reasons is that I am so perplexed by the way the law applicable to this case has developed that it would be inappropriate for me to try it again."
© 2008 The Washington Post Company
Stormwater Management Total Stormwater Management Service Design, Repair & Maintenance www.apexcos.com
Government protection of wetland pathetic
EPA Enforcement Is Faulted
Agency Official Cites Narrow Reading of Clean Water Act
By Juliet Eilperin Washington Post Staff Writer Tuesday, July 8, 2008; A06
An official administration guidance document on wetland policy is undermining enforcement of the Clean Water Act, said a March 4 memo written by the Environmental Protection Agency's chief enforcement officer.
The memo by Granta Y. Nakayama, EPA's assistant administrator for enforcement and compliance assurance, was obtained by the advocacy group Greenpeace and released yesterday by two House Democratic committee chairmen. It highlights the confusion that has afflicted federal wetland protections since a 2006 Supreme Court decision.
That 5 to 4 decision, known as Rapanos v. United States, held that the Army Corps of Engineers had exceeded its authority when it denied two Michigan developers permits to build on wetland, but the court split on where the Corps should have drawn the line on what areas deserve protection.
A plurality made of up Chief Justice John G. Roberts Jr. and Justices Antonin Scalia, Clarence Thomas and Samuel A. Alito Jr. proposed an across-the-board reduction in the Corps' regulatory role, but Justice Anthony M. Kennedy -- who cast the deciding vote -- called for a case-by-case approach in deciding how the government should proceed. That left the ruling open to interpretation.
In his memo to Benjamin Grumbles, EPA's assistant administrator for water, Nakayama wrote that the document the agency issued in June 2007 to guide regulators' decisions under the Rapanos decision is having "a significant impact on enforcement." Nakayama and his staff concluded that between July 2006 and December 2007, EPA's regional offices had decided not to pursue potential Clean Water Act violations in 304 cases "because of jurisdictional uncertainty."
Much of the controversy centers on what sort of waterway and accompanying wetland should qualify for protection. The administration's guidance instructs federal officials to focus on the "relevant reach" of a tributary, which translates into a single segment of a stream. In the memo, Nakayama argued that this definition "isolates the small tributary" and "ignores longstanding scientific ecosystem and watershed protection principles critical to meeting the goals" of the Clean Water Act.
Chairmen Henry A. Waxman (D-Calif.) of the House Government Oversight and Reform Committee and James L. Oberstar (D-Minn.) of the Transportation and Infrastructure Committee sent a letter yesterday to EPA Administrator Stephen L. Johnson saying they have "grave concerns" about the way the agency is implementing the Clean Water Act.
The two noted that Nakayama concluded that in all, the Supreme Court decision and the subsequent guidance document "negatively affected approximately 500 enforcement cases" in nine months. They also questioned why EPA's Grumbles did not raise the issue when he testified before Oberstar's panel less than three months ago.
"This sudden reduction in enforcement activity will undermine the implementation of the Clean Water Act and adversely affect EPA's responsibility to protect the nation's waters," the congressmen wrote. "Yet instead of sounding the alarm about EPA's enforcement problems, the agency's public statements have minimized the impact of the Rapanos decision."
In response to a question about the congressional inquiry, EPA spokesman Jonathan Shradar said in an e-mail: "We will be reviewing the new request and will work with the chairmen to provide information on our enforcement program."
Eric Schaeffer, who used to head EPA's civil enforcement division and now heads the Environmental Integrity Project, an advocacy group, called Nakayama's memo "very significant. It lays out very clearly why you can't enforce one of the most important parts of the Clean Water Act."
EPA officials are not the only ones growing frustrated with the confusing legal interpretations of the Rapanos decision. Robert B. Propst, a senior judge on the U.S. District Court for the Northern District of Alabama, Southern Division, wrote in a Nov. 7, 2007, decision that he was reassigning a wetland case "to another judge for trial. At least one of the reasons is that I am so perplexed by the way the law applicable to this case has developed that it would be inappropriate for me to try it again."
© 2008 The Washington Post Company
Stormwater Management Total Stormwater Management Service Design, Repair & Maintenance www.apexcos.com
Agency Official Cites Narrow Reading of Clean Water Act
By Juliet Eilperin Washington Post Staff Writer Tuesday, July 8, 2008; A06
An official administration guidance document on wetland policy is undermining enforcement of the Clean Water Act, said a March 4 memo written by the Environmental Protection Agency's chief enforcement officer.
The memo by Granta Y. Nakayama, EPA's assistant administrator for enforcement and compliance assurance, was obtained by the advocacy group Greenpeace and released yesterday by two House Democratic committee chairmen. It highlights the confusion that has afflicted federal wetland protections since a 2006 Supreme Court decision.
That 5 to 4 decision, known as Rapanos v. United States, held that the Army Corps of Engineers had exceeded its authority when it denied two Michigan developers permits to build on wetland, but the court split on where the Corps should have drawn the line on what areas deserve protection.
A plurality made of up Chief Justice John G. Roberts Jr. and Justices Antonin Scalia, Clarence Thomas and Samuel A. Alito Jr. proposed an across-the-board reduction in the Corps' regulatory role, but Justice Anthony M. Kennedy -- who cast the deciding vote -- called for a case-by-case approach in deciding how the government should proceed. That left the ruling open to interpretation.
In his memo to Benjamin Grumbles, EPA's assistant administrator for water, Nakayama wrote that the document the agency issued in June 2007 to guide regulators' decisions under the Rapanos decision is having "a significant impact on enforcement." Nakayama and his staff concluded that between July 2006 and December 2007, EPA's regional offices had decided not to pursue potential Clean Water Act violations in 304 cases "because of jurisdictional uncertainty."
Much of the controversy centers on what sort of waterway and accompanying wetland should qualify for protection. The administration's guidance instructs federal officials to focus on the "relevant reach" of a tributary, which translates into a single segment of a stream. In the memo, Nakayama argued that this definition "isolates the small tributary" and "ignores longstanding scientific ecosystem and watershed protection principles critical to meeting the goals" of the Clean Water Act.
Chairmen Henry A. Waxman (D-Calif.) of the House Government Oversight and Reform Committee and James L. Oberstar (D-Minn.) of the Transportation and Infrastructure Committee sent a letter yesterday to EPA Administrator Stephen L. Johnson saying they have "grave concerns" about the way the agency is implementing the Clean Water Act.
The two noted that Nakayama concluded that in all, the Supreme Court decision and the subsequent guidance document "negatively affected approximately 500 enforcement cases" in nine months. They also questioned why EPA's Grumbles did not raise the issue when he testified before Oberstar's panel less than three months ago.
"This sudden reduction in enforcement activity will undermine the implementation of the Clean Water Act and adversely affect EPA's responsibility to protect the nation's waters," the congressmen wrote. "Yet instead of sounding the alarm about EPA's enforcement problems, the agency's public statements have minimized the impact of the Rapanos decision."
In response to a question about the congressional inquiry, EPA spokesman Jonathan Shradar said in an e-mail: "We will be reviewing the new request and will work with the chairmen to provide information on our enforcement program."
Eric Schaeffer, who used to head EPA's civil enforcement division and now heads the Environmental Integrity Project, an advocacy group, called Nakayama's memo "very significant. It lays out very clearly why you can't enforce one of the most important parts of the Clean Water Act."
EPA officials are not the only ones growing frustrated with the confusing legal interpretations of the Rapanos decision. Robert B. Propst, a senior judge on the U.S. District Court for the Northern District of Alabama, Southern Division, wrote in a Nov. 7, 2007, decision that he was reassigning a wetland case "to another judge for trial. At least one of the reasons is that I am so perplexed by the way the law applicable to this case has developed that it would be inappropriate for me to try it again."
© 2008 The Washington Post Company
Stormwater Management Total Stormwater Management Service Design, Repair & Maintenance www.apexcos.com
Tuesday, July 8, 2008
Condo developers on Beaver Lake seeking extension of project approval from Benton County
To All ABLE Members,
I am sending this email to galvanize our ABLE membership to take action! The Grandview Heights condo developers are back, this time to request a two-year extension from the Benton County Planning Board. This is a chance to kill this project once and for all!
The Planning board meeting will be at 5:30 on Wednesday, July 16. It will be held in the Quorum Court room (3rd floor), in the Benton County Administration building. This building is just east of the courthouse located on the Bentonville Square. The room isn’t real large, so please get there between 4:30 and 5 if possible. If you are comfortable doing so, please plan on speaking during the public comment period. There is a 3-minute limit per person and of course you don’t have to use the full time. I will provide some talking points below. There are a lot of issues to talk about, so just pick a few points that you are comfortable talking about.
In addition to having people speak during the time allotted for public comment, it would be a good idea to over pack the room. This would send a message to the planning board that there are still many concerned citizens who do not want this project’s developers to do any more damage than they already have. So even if you don't speak, please be there and come early - the room will probably over fill. By the way - if we fill the room by 4:30 or 5 - there will not be room for the condo team to come in and sit down other than their speaker. I don't anticipate very many red shirts coming out to support the condos.
Some background for any of you who are wondering what the meeting is all about:
Grandview Heights was approved in 2005 with a list of 13 required items and a 2 year window in which to pull a building permit. The approval was for a 15-story condo building, and two additional buildings up to 25 stories each. The 2 years expire on July 21st. Now they are asking for a 2-year extension.
The main overriding issue is that the condo project is in such a mess financially; it is unlikely they can get a completion bond – one of the 13 items required by the County. If they can't get the completion bond (which requires a strong financial position) then they can't get a building permit and therefore cannot build the project.
What is the financial mess? They are in foreclosure on the property - 2 entities are fighting over who is first in line to foreclose. A foreclosure is a lawsuit - so both the seller of the property and a group that lent them money are suing the developer. There are also liens against the property for unpaid work done at the site. Neither the dirt work contractor nor the engineering firm has been paid and the team that designed the sewage treatment system also has not been paid. And, it is astonishing to me that the property taxes are delinquent. I'm not surprised the taxes weren't paid - I'm astonished that the developer has the nerve to go in and ask the same County for an extension! This alone should make them ineligible to ask for more time.
There are many other reasons not to give an extension. In 2 1/2 years, they have not completed any of the 13 requirements the County gave this project. The Arkansas Dept. of Environmental Quality denied their request for a sewage treatment facility. and – they never completed a fire study and therefore do not have the required agreement with the fire department.
Ultimately, the developers could not perform, scarred the land, and ripped off some local companies as well as the county taxpayers! Why would this planning board even consider an extension for this project?
The County Planning Regulations (Blue Book) state in Chapter I Section 5 (page 6):
"The planning board may modify, vary, or waive the requirements of this ordinance by an affirmative vote of two-thirds (2/3) vote of the total membership of the Benton County Planning Board. Note: a two-thirds vote of the attending quorum is not sufficient. The criteria to grant such modification, variances, or waiver shall be, without exception, and singularly because strict compliance with any provision of this ordinance would cause exceptional or undue hardship to the land developer. Additionally, extra expense, economic hardship, or additional outlay of capital funds or money shall never constitute grounds for exceptional or undue hardship".
So, someone needs to state that any vote for an extension would require 5 yes votes, and that there is no reason that the developers can give for an extension other than economic hardship, and that is specifically excluded in the Planning regulations as stated above.
If you cannot attend the meeting on the 16th, or do not wish to speak, please email your arguments to the Planning Director and Planning Board members below.
Planning Director Ashley Pope – apope@co.benton.ar.us
Bill Kneebone bkmj@centurytel.net
Caleb Henry chenry@ozarkcivil.com
Heath Ward Heath_Ward@cargill.com
Mark Gray markagray@earthlink.net
Scott Borman Scott.Borman@bwrpwa.com
Tim Sorey trs@sandcreek.us
Adele Lucus unknown
Please participate. Only through all of our efforts will we succeed!
I expect to hear a really slick sales pitch on the 16th from the developer’s attorney. It will probably be something like… “we have investors lined up, but they won’t invest unless you give us the additional time”. The media will all be there. Hope to see you on the 16th at 4:30 (meeting starts at 5:30)!
Doug Timmons
President, ABLE
I am sending this email to galvanize our ABLE membership to take action! The Grandview Heights condo developers are back, this time to request a two-year extension from the Benton County Planning Board. This is a chance to kill this project once and for all!
The Planning board meeting will be at 5:30 on Wednesday, July 16. It will be held in the Quorum Court room (3rd floor), in the Benton County Administration building. This building is just east of the courthouse located on the Bentonville Square. The room isn’t real large, so please get there between 4:30 and 5 if possible. If you are comfortable doing so, please plan on speaking during the public comment period. There is a 3-minute limit per person and of course you don’t have to use the full time. I will provide some talking points below. There are a lot of issues to talk about, so just pick a few points that you are comfortable talking about.
In addition to having people speak during the time allotted for public comment, it would be a good idea to over pack the room. This would send a message to the planning board that there are still many concerned citizens who do not want this project’s developers to do any more damage than they already have. So even if you don't speak, please be there and come early - the room will probably over fill. By the way - if we fill the room by 4:30 or 5 - there will not be room for the condo team to come in and sit down other than their speaker. I don't anticipate very many red shirts coming out to support the condos.
Some background for any of you who are wondering what the meeting is all about:
Grandview Heights was approved in 2005 with a list of 13 required items and a 2 year window in which to pull a building permit. The approval was for a 15-story condo building, and two additional buildings up to 25 stories each. The 2 years expire on July 21st. Now they are asking for a 2-year extension.
The main overriding issue is that the condo project is in such a mess financially; it is unlikely they can get a completion bond – one of the 13 items required by the County. If they can't get the completion bond (which requires a strong financial position) then they can't get a building permit and therefore cannot build the project.
What is the financial mess? They are in foreclosure on the property - 2 entities are fighting over who is first in line to foreclose. A foreclosure is a lawsuit - so both the seller of the property and a group that lent them money are suing the developer. There are also liens against the property for unpaid work done at the site. Neither the dirt work contractor nor the engineering firm has been paid and the team that designed the sewage treatment system also has not been paid. And, it is astonishing to me that the property taxes are delinquent. I'm not surprised the taxes weren't paid - I'm astonished that the developer has the nerve to go in and ask the same County for an extension! This alone should make them ineligible to ask for more time.
There are many other reasons not to give an extension. In 2 1/2 years, they have not completed any of the 13 requirements the County gave this project. The Arkansas Dept. of Environmental Quality denied their request for a sewage treatment facility. and – they never completed a fire study and therefore do not have the required agreement with the fire department.
Ultimately, the developers could not perform, scarred the land, and ripped off some local companies as well as the county taxpayers! Why would this planning board even consider an extension for this project?
The County Planning Regulations (Blue Book) state in Chapter I Section 5 (page 6):
"The planning board may modify, vary, or waive the requirements of this ordinance by an affirmative vote of two-thirds (2/3) vote of the total membership of the Benton County Planning Board. Note: a two-thirds vote of the attending quorum is not sufficient. The criteria to grant such modification, variances, or waiver shall be, without exception, and singularly because strict compliance with any provision of this ordinance would cause exceptional or undue hardship to the land developer. Additionally, extra expense, economic hardship, or additional outlay of capital funds or money shall never constitute grounds for exceptional or undue hardship".
So, someone needs to state that any vote for an extension would require 5 yes votes, and that there is no reason that the developers can give for an extension other than economic hardship, and that is specifically excluded in the Planning regulations as stated above.
If you cannot attend the meeting on the 16th, or do not wish to speak, please email your arguments to the Planning Director and Planning Board members below.
Planning Director Ashley Pope – apope@co.benton.ar.us
Bill Kneebone bkmj@centurytel.net
Caleb Henry chenry@ozarkcivil.com
Heath Ward Heath_Ward@cargill.com
Mark Gray markagray@earthlink.net
Scott Borman Scott.Borman@bwrpwa.com
Tim Sorey trs@sandcreek.us
Adele Lucus unknown
Please participate. Only through all of our efforts will we succeed!
I expect to hear a really slick sales pitch on the 16th from the developer’s attorney. It will probably be something like… “we have investors lined up, but they won’t invest unless you give us the additional time”. The media will all be there. Hope to see you on the 16th at 4:30 (meeting starts at 5:30)!
Doug Timmons
President, ABLE
Friday, July 4, 2008
Downtown General zone? Why not Neighborhood Conservation?
Please click on image of native-stone house and giant catalpa trees uphill from Spout Spring Branch in south Fayetteville, Arkansas. This lot and adjacent blocks in the area would be zoned Downtown General rather than Neighborhood Conservation if the Walker Park Neighborhood Master Plan is not revised.

When I advocated closer study of geography and existing homes in the Walker Park neighborhood before the rezoning plan is approved, I was thinking of many places.
Here is the intersection at the far northeast corner of the Walker Park master plan and it is in blue on the concept plan as "downtown general." I was wrong about that being Mary Carr's house, which is a block north on Huntsville.
IMPORTANT THINGS TO PROTECT In this photo:
Riparian zone of Spout Spring Branch starts part way down this lot this corner lot or it certainly starts in the adjoining lot. Any disruption of soil or anything else on this property would be within what should be the no-build zone to protect the Beaver Lake Watershed and would imperial the quality of the stream.
GIANT catalpa trees are pretty common in this part of town but are being taken down regularly. Here here are examples worth saving.
Native stone houses are disappearing rapidly in this part of town and here is an example worth saving. I know, it isn't of as high quality as the one removed from the land of the late Ray Adams on S. School Ave. to make way for Advance Auto, but it is a wonderful dwelling and of historic value.
Mill Ave., of course, is the extension of E. South Street leading northeastward from the narrow block that was discussed by Tony Wappel in the council meeting this past Tuesday.
Enjoy the holiday!
When I advocated closer study of geography and existing homes in the Walker Park neighborhood before the rezoning plan is approved, I was thinking of many places.
Here is the intersection at the far northeast corner of the Walker Park master plan and it is in blue on the concept plan as "downtown general." I was wrong about that being Mary Carr's house, which is a block north on Huntsville.
IMPORTANT THINGS TO PROTECT In this photo:
Riparian zone of Spout Spring Branch starts part way down this lot this corner lot or it certainly starts in the adjoining lot. Any disruption of soil or anything else on this property would be within what should be the no-build zone to protect the Beaver Lake Watershed and would imperial the quality of the stream.
GIANT catalpa trees are pretty common in this part of town but are being taken down regularly. Here here are examples worth saving.
Native stone houses are disappearing rapidly in this part of town and here is an example worth saving. I know, it isn't of as high quality as the one removed from the land of the late Ray Adams on S. School Ave. to make way for Advance Auto, but it is a wonderful dwelling and of historic value.
Mill Ave., of course, is the extension of E. South Street leading northeastward from the narrow block that was discussed by Tony Wappel in the council meeting this past Tuesday.
Enjoy the holiday!
Thursday, July 3, 2008
Nancy Allen: Woman of integrity
Please click on image to ENLARGE PHOTO OF CITY COUNCIL MEMBER NANCY ALLEN at the June 30 meeting of Ward Four residents.

The Morning News
Local News for Northwest Arkansas
Allen Not Seeking Re-election
By Skip Descant
The Morning News
http://www.nwaonline.net/articles/2008/07/02/news/070308fzallen.prt
http://www.nwaonline.net/articles/2008/07/02/news/070308fzallen.txt
FATETTEVILLE - Fayetteville City Council member Nancy Allen announced Wednesday she does not plan to seek re-election.
Allen has also remained mostly silent on what her plans might be.
"I have not given any thought to what I might want to do after my time on the council has ended, but I do know I will not be happy sitting at home eating Twinkies and watching 'Mister Ed' reruns. So, I will find ways to continue to be involved," said Allen, a long-time teacher in Fayetteville public schools.
Allen, 61, who represents Ward 2, came forward with a statement Wednesday saying she did not plan to seek re-election.
"After months of soul searching, I have decided not to seek re-election for Ward 2 Alderman," wrote Allen, a one-term alderwoman, in her statement.
"The council has been the most interesting job I have ever had," she continued. In addition to her time spent as a school teacher, Allen has also served on the Fayetteville Planning and Zoning Commission and the Fayetteville Council of Neighborhoods.
"It has also been disillusioning. I have discovered that I am not a politician, but I regret none of it and am proud that I did not deviate from the things I said I would do, stood up for my principles, asked hard questions, and have not been intimidated," she wrote.
The Times article shortens Nancy's e-mailed announcement to the news media. Here is the full version:
"After months of soul searching, I have decided not to seek reelection for Ward 2 Alderman.
"I have served as president and vice president of FCON (the council of neighborhoods) for two years each, six years on the Planning Commission, and two years on the City Council and find I would like to take some time for other things I care about and enjoy.
"Serving on the council has been the most interesting job I have ever had. It has also been disillusioning.
"I have discovered that I am not a politician, but I regret none of it and am proud that I did not deviate from the things I said I would do, stood up for my principles, asked hard questions, and have not been intimidated.
"I will hold to those values as I continue through my elected term.
"I have given over half of my salary to social programs that were affected most by the budget cuts. Doing that has given me great pleasure. And, while the money will be gone, the passion is not. I can still work for these programs.
"I am proud that, when serving on them, I have never missed a meeting of FCON, the Planning Commission, or the City Council.
"Some of my personal highlights during my term have been being invited to eat Christmas dinner at the High Rise, voted outstanding alderman by a labor union, presenting rings to the FHS Bulldogs for winning the State Championship, and being a part of renaming 6th Street to Martin Luther King Boulevard.
"I have met many wonderful people I would not otherwise have known. Thanks to the people of Ward 2 for putting your faith in me these past two years and allowing me to serve my beloved Fayetteville."
I hope Nancy's friends in Ward 2 will let her know how much they appreciate her service. And maybe suggest she change her decision before the day comes for official registration as a candidate.
Nancy resigned from the Council of Neighborhoods and announced her candidacy for the council position after Don Marr resigned from the council less than half-way through his second term. That was right after the council was stampeded into voting to approve the Divinity Hotel across Dickson Street from Collier's Drug store and the U.S. Post Office. Thanks to a couple of long-time Fayetteville residents who filed suit against the city for passing the project it was never built and the developer got invited to bankruptcy court for some of his previous mistakes. Meanwhile, Nancy led the effort to limit building height on Dickson Street, something those who loved Fayetteville back when Fayetteville was cool could appreciate.
Her announcement was the start of what I expected to be a serious change for the good on the council. Women just seem to understand the needs of people more than a lot of men. At that time I thought we were headed toward a truly "kinder, gentler, more thoughtful council."
This announcement diminishes my hope for such a change. But maybe another highly principled woman will step up and campaign for the seat. Fayetteville needs men and women who care what the people think and care about. And Nancy's example should certainly inspire someone else, man or woman, with integrity to make the sacrifice to seek the position and take the responsibility.
The Morning News
Local News for Northwest Arkansas
Allen Not Seeking Re-election
By Skip Descant
The Morning News
http://www.nwaonline.net/articles/2008/07/02/news/070308fzallen.prt
http://www.nwaonline.net/articles/2008/07/02/news/070308fzallen.txt
FATETTEVILLE - Fayetteville City Council member Nancy Allen announced Wednesday she does not plan to seek re-election.
Allen has also remained mostly silent on what her plans might be.
"I have not given any thought to what I might want to do after my time on the council has ended, but I do know I will not be happy sitting at home eating Twinkies and watching 'Mister Ed' reruns. So, I will find ways to continue to be involved," said Allen, a long-time teacher in Fayetteville public schools.
Allen, 61, who represents Ward 2, came forward with a statement Wednesday saying she did not plan to seek re-election.
"After months of soul searching, I have decided not to seek re-election for Ward 2 Alderman," wrote Allen, a one-term alderwoman, in her statement.
"The council has been the most interesting job I have ever had," she continued. In addition to her time spent as a school teacher, Allen has also served on the Fayetteville Planning and Zoning Commission and the Fayetteville Council of Neighborhoods.
"It has also been disillusioning. I have discovered that I am not a politician, but I regret none of it and am proud that I did not deviate from the things I said I would do, stood up for my principles, asked hard questions, and have not been intimidated," she wrote.
The Times article shortens Nancy's e-mailed announcement to the news media. Here is the full version:
"After months of soul searching, I have decided not to seek reelection for Ward 2 Alderman.
"I have served as president and vice president of FCON (the council of neighborhoods) for two years each, six years on the Planning Commission, and two years on the City Council and find I would like to take some time for other things I care about and enjoy.
"Serving on the council has been the most interesting job I have ever had. It has also been disillusioning.
"I have discovered that I am not a politician, but I regret none of it and am proud that I did not deviate from the things I said I would do, stood up for my principles, asked hard questions, and have not been intimidated.
"I will hold to those values as I continue through my elected term.
"I have given over half of my salary to social programs that were affected most by the budget cuts. Doing that has given me great pleasure. And, while the money will be gone, the passion is not. I can still work for these programs.
"I am proud that, when serving on them, I have never missed a meeting of FCON, the Planning Commission, or the City Council.
"Some of my personal highlights during my term have been being invited to eat Christmas dinner at the High Rise, voted outstanding alderman by a labor union, presenting rings to the FHS Bulldogs for winning the State Championship, and being a part of renaming 6th Street to Martin Luther King Boulevard.
"I have met many wonderful people I would not otherwise have known. Thanks to the people of Ward 2 for putting your faith in me these past two years and allowing me to serve my beloved Fayetteville."
I hope Nancy's friends in Ward 2 will let her know how much they appreciate her service. And maybe suggest she change her decision before the day comes for official registration as a candidate.
Nancy resigned from the Council of Neighborhoods and announced her candidacy for the council position after Don Marr resigned from the council less than half-way through his second term. That was right after the council was stampeded into voting to approve the Divinity Hotel across Dickson Street from Collier's Drug store and the U.S. Post Office. Thanks to a couple of long-time Fayetteville residents who filed suit against the city for passing the project it was never built and the developer got invited to bankruptcy court for some of his previous mistakes. Meanwhile, Nancy led the effort to limit building height on Dickson Street, something those who loved Fayetteville back when Fayetteville was cool could appreciate.
Her announcement was the start of what I expected to be a serious change for the good on the council. Women just seem to understand the needs of people more than a lot of men. At that time I thought we were headed toward a truly "kinder, gentler, more thoughtful council."
This announcement diminishes my hope for such a change. But maybe another highly principled woman will step up and campaign for the seat. Fayetteville needs men and women who care what the people think and care about. And Nancy's example should certainly inspire someone else, man or woman, with integrity to make the sacrifice to seek the position and take the responsibility.
Wednesday, July 2, 2008
July is buttonbush month in Northwest Arkansas wetland areas and along streams and ditches
PLEASE CLICK ON IMAGE TO ENLARGE PHOTO of Buttonbush inflorescence on World Peace Wetland Prairie on June 2, 2008.

I have been asked why I discourage people from using radical clearing methods on wetland prairies, especially small parcels and urban parcels such as World Peace Wetland Prairie.
One of the main reasons is that some prairie and wetland native species need to grow tall and strong and not be cut bank or burned off if they are to reach their full potential.
The buttonbush is among the easiest to identify in this category at this time of year. The buttonbush is a sure marker of wetland when found growing in the wild. Its value to many species of wildlife is well-documented. And it is among the better native species for protecting riparian zones of streams from eroding.
Read what Texas A&M's Aquaplant Website has to say about the amazing buttonbush.
http://aquaplant.tamu.edu/database/emergent_plants/buttonbush.htm
WWW AQUAPLANT
Plant Identification
Bulrush
Cattail
Buttonbush
Description Management Options Other Photos
Cephalanthus occidentalis
Buttonbush is a woody shrub (3-10 feet tall) that occasionally grows into a small tree and can be found above water or in water up to 4 feet deep. It has shiny dark-green spear-or egg-shaped pointed leaves 3 to 6 inches long. The leaves are opposite or whorled in 3's or 4's along the stem. Flowers of buttonbush are easily identified by their greenish-white tube flowers in dense ball-shaped clusters about 1 inch in diameter. Seed heads are brown.
Submerged portions of all aquatic plants provide habitats for many micro and macro invertebrates. These invertebrates in turn are used as food by fish and other wildlife species (e.g. amphibians, reptiles, ducks, etc. ). After aquatic plants die, their decomposition by bacteria and fungi provides food (called "detritus") for many aquatic invertebrates. Buttonbush seeds are occasionally eaten by ducks but the bush itself is used for nesting by many bird species.
Emergent Plant Index
Alligator Weed
American Lotus
Arrowhead
Banana Lily (Floating Heart)
Blue Flag
Bulrush
Bull Tongue
Buttonbush
Cattail
Common Reed
Cow Lily (Spatterdock)
Dollar Bonnet (Water Shield)
Floating Heart (Banana Lily)
Fragrant Water Lily (White Water Lily)
Frog's-bit
Giant Reed
Horsetail
Lizard's Tail
Maidencane
Mexican Water Lily (Yellow Water Lily) Pickerelweed
Sedges
Smartweed (Water Pepper)
Soft Rush
Southern Watergrass
Spatterdock (Cow Lily)
Spike Rush
Three-Square
Torpedograss
Waterleaf
Water Pennywort
Water Pepper (Smartweed)
Water Primrose
Water Shield (Dollar Bonnet)
White Water Lily (Fragrant Water Lily)
Willow
Yellow Water Lily (Mexican Water Lily)
Back to Top
Copyright (C) 2000-2008 Texas AgriLife Extension Service. All rights reserved.
I have been asked why I discourage people from using radical clearing methods on wetland prairies, especially small parcels and urban parcels such as World Peace Wetland Prairie.
One of the main reasons is that some prairie and wetland native species need to grow tall and strong and not be cut bank or burned off if they are to reach their full potential.
The buttonbush is among the easiest to identify in this category at this time of year. The buttonbush is a sure marker of wetland when found growing in the wild. Its value to many species of wildlife is well-documented. And it is among the better native species for protecting riparian zones of streams from eroding.
Read what Texas A&M's Aquaplant Website has to say about the amazing buttonbush.
http://aquaplant.tamu.edu/database/emergent_plants/buttonbush.htm
WWW AQUAPLANT
Plant Identification
Bulrush
Cattail
Buttonbush
Description Management Options Other Photos
Cephalanthus occidentalis
Buttonbush is a woody shrub (3-10 feet tall) that occasionally grows into a small tree and can be found above water or in water up to 4 feet deep. It has shiny dark-green spear-or egg-shaped pointed leaves 3 to 6 inches long. The leaves are opposite or whorled in 3's or 4's along the stem. Flowers of buttonbush are easily identified by their greenish-white tube flowers in dense ball-shaped clusters about 1 inch in diameter. Seed heads are brown.
Submerged portions of all aquatic plants provide habitats for many micro and macro invertebrates. These invertebrates in turn are used as food by fish and other wildlife species (e.g. amphibians, reptiles, ducks, etc. ). After aquatic plants die, their decomposition by bacteria and fungi provides food (called "detritus") for many aquatic invertebrates. Buttonbush seeds are occasionally eaten by ducks but the bush itself is used for nesting by many bird species.
Emergent Plant Index
Alligator Weed
American Lotus
Arrowhead
Banana Lily (Floating Heart)
Blue Flag
Bulrush
Bull Tongue
Buttonbush
Cattail
Common Reed
Cow Lily (Spatterdock)
Dollar Bonnet (Water Shield)
Floating Heart (Banana Lily)
Fragrant Water Lily (White Water Lily)
Frog's-bit
Giant Reed
Horsetail
Lizard's Tail
Maidencane
Mexican Water Lily (Yellow Water Lily) Pickerelweed
Sedges
Smartweed (Water Pepper)
Soft Rush
Southern Watergrass
Spatterdock (Cow Lily)
Spike Rush
Three-Square
Torpedograss
Waterleaf
Water Pennywort
Water Pepper (Smartweed)
Water Primrose
Water Shield (Dollar Bonnet)
White Water Lily (Fragrant Water Lily)
Willow
Yellow Water Lily (Mexican Water Lily)
Back to Top
Copyright (C) 2000-2008 Texas AgriLife Extension Service. All rights reserved.
Tuesday, July 1, 2008
Sunday, June 29, 2008
Arkansas Pollution Control and Ecology Commission fails to add carbon dioxide to state list of air contaminants
Panel denies air-code changes
BY MICHELLE HILLEN
Posted on Saturday, June 28, 2008
URL: http://www.nwanews.com/adg/News/229886/
Saying the request was premature, the Arkansas Pollution Control and Ecology Commission on Friday unanimously rejected a request by environmental groups to change Arkansas’ air code to consider carbon dioxide an “air contaminant.”
“I do think this is putting the cart before the horse,” commission member Scott Henderson, explaining that he believes the governor’s Global Warming Commission should have first crack at determining how carbon dioxide emissions should be regulated.
The commission, established last year, is studying ways state agencies can offset factors that might contribute to climate change.
“I don’t agree with the discussion about waiting for the federal government to do it, but I do think the Global Warming Commission has to do its work,” Henderson said.
The Arkansas Sierra Club, Audubon Arkansas and the Environmental Integrity Project had filed a petition seeking to amend definitions included in Regulations 18 and 26 of the state’s airquality regulations. The proposal called for the definitions in both regulations to eliminate carbon dioxide from a list of emissions not considered air contaminants, including water vapor, oxygen, nitrogen, hydrogen and inert gases.
The petition cited concerns that increased concentrations of carbon dioxide in the atmosphere can lead to higher maximum temperatures, more hot days, higher minimum temperatures, fewer cold days, more intense “precipitation events” and increased risk of drought.
Environmentalists argued their proposal wouldn’t immediately require regulation of carbon dioxide by the Environmental Quality Department. But industry and department officials disagreed.
“We are not opposed to the removal of this exemption.... We realize that global warming is a global problem,” department Director Teresa Marks said. “Our concern is unintended consequences, and the practicality of what we would do if the exemption was removed immediately.”
Marks said existing regulations would require the department to regulate anyone who emits more than 25 tons per year of an “air contaminant.” The department today doesn’t have the technology available to regulate emissions of carbon dioxide, she said.
After more than a half-hour of comments from industry leaders and environmentalists, the commission approved an order supplied by the Arkansas Environmental Federation, an organization that lobbies on behalf of companies on environmental matters.
The order states that the request from the environmental- ists was defective for a number of reasons, including that it failed to include an economic impact statement and an environmental benefit analysis. Such statements are required by state law if the proposed change is more stringent than federal requirements.
Glen Hooks, regional representative of the Sierra Club, said he was surprised by the decision.
“I think what these guys have done is stand up and say we know CO 2 is a pollutant, we know it is a contaminant, but we don’t want to do anything about it,” Hooks said.
“They said it publicly, and I found it amazing.”
He said he and other environmentalists expect to bring forward a new petition that addresses the commissioners’ concerns sooner rather than later.
“We’ll be back,” said Ilan Levin of the Environmental Integrity Project.
The concerns can be addressed in a number of ways, including by increasing the allowable emission threshold from 25 tons per year, Levin said.
Copyright © 2001-2008 Arkansas Democrat-Gazette, Inc. All rights reserved. Contact: webmaster@nwanews.com
BY MICHELLE HILLEN
Posted on Saturday, June 28, 2008
URL: http://www.nwanews.com/adg/News/229886/
Saying the request was premature, the Arkansas Pollution Control and Ecology Commission on Friday unanimously rejected a request by environmental groups to change Arkansas’ air code to consider carbon dioxide an “air contaminant.”
“I do think this is putting the cart before the horse,” commission member Scott Henderson, explaining that he believes the governor’s Global Warming Commission should have first crack at determining how carbon dioxide emissions should be regulated.
The commission, established last year, is studying ways state agencies can offset factors that might contribute to climate change.
“I don’t agree with the discussion about waiting for the federal government to do it, but I do think the Global Warming Commission has to do its work,” Henderson said.
The Arkansas Sierra Club, Audubon Arkansas and the Environmental Integrity Project had filed a petition seeking to amend definitions included in Regulations 18 and 26 of the state’s airquality regulations. The proposal called for the definitions in both regulations to eliminate carbon dioxide from a list of emissions not considered air contaminants, including water vapor, oxygen, nitrogen, hydrogen and inert gases.
The petition cited concerns that increased concentrations of carbon dioxide in the atmosphere can lead to higher maximum temperatures, more hot days, higher minimum temperatures, fewer cold days, more intense “precipitation events” and increased risk of drought.
Environmentalists argued their proposal wouldn’t immediately require regulation of carbon dioxide by the Environmental Quality Department. But industry and department officials disagreed.
“We are not opposed to the removal of this exemption.... We realize that global warming is a global problem,” department Director Teresa Marks said. “Our concern is unintended consequences, and the practicality of what we would do if the exemption was removed immediately.”
Marks said existing regulations would require the department to regulate anyone who emits more than 25 tons per year of an “air contaminant.” The department today doesn’t have the technology available to regulate emissions of carbon dioxide, she said.
After more than a half-hour of comments from industry leaders and environmentalists, the commission approved an order supplied by the Arkansas Environmental Federation, an organization that lobbies on behalf of companies on environmental matters.
The order states that the request from the environmental- ists was defective for a number of reasons, including that it failed to include an economic impact statement and an environmental benefit analysis. Such statements are required by state law if the proposed change is more stringent than federal requirements.
Glen Hooks, regional representative of the Sierra Club, said he was surprised by the decision.
“I think what these guys have done is stand up and say we know CO 2 is a pollutant, we know it is a contaminant, but we don’t want to do anything about it,” Hooks said.
“They said it publicly, and I found it amazing.”
He said he and other environmentalists expect to bring forward a new petition that addresses the commissioners’ concerns sooner rather than later.
“We’ll be back,” said Ilan Levin of the Environmental Integrity Project.
The concerns can be addressed in a number of ways, including by increasing the allowable emission threshold from 25 tons per year, Levin said.
Copyright © 2001-2008 Arkansas Democrat-Gazette, Inc. All rights reserved. Contact: webmaster@nwanews.com
Saturday, June 28, 2008
Association for Beaver Lake Environment growing!
From: President@able-ark.org
Sent: Sat 6/28/08 12:51 PM
To: aubreyshepherd@hotmail.com
This is an e-mail from 'Able-Ark.org - Association for Beaver Lake Environment '
Message:
Hello ABLE members,
I wanted to let you know that ABLE hosted a special Town Hall Meeting for Beaver Lake Dock Owners on Monday, June 23, 2008. The purpose of the meeting was to sell ABLE to Beaver Lake property owners, identify/discuss issues affecting and threatening the lake, and to increase ABLE membership. This meeting was very successful! We have signed up many new members, the meeting was standing room only, over 110 people attended!
We also had two guest speakers:
Thad Cheaney from the U.S. Army Corp. of Engineers - discussed dock and shoreline issues.
Nathan Jones, VP of Power Source Solar - discussed solar applications on boat docks.
I have posted the program on the website (www.able-ark.org). Login, click on "Information Library" page, and then click on Town Hall Meetings. You will see the "Dock Owners Meeting". You will need Adobe Acrobat in order to view the program.
Thanks for supporting ABLE!
Doug Timmons
President, ABLE
Sent: Sat 6/28/08 12:51 PM
To: aubreyshepherd@hotmail.com
This is an e-mail from 'Able-Ark.org - Association for Beaver Lake Environment '
Message:
Hello ABLE members,
I wanted to let you know that ABLE hosted a special Town Hall Meeting for Beaver Lake Dock Owners on Monday, June 23, 2008. The purpose of the meeting was to sell ABLE to Beaver Lake property owners, identify/discuss issues affecting and threatening the lake, and to increase ABLE membership. This meeting was very successful! We have signed up many new members, the meeting was standing room only, over 110 people attended!
We also had two guest speakers:
Thad Cheaney from the U.S. Army Corp. of Engineers - discussed dock and shoreline issues.
Nathan Jones, VP of Power Source Solar - discussed solar applications on boat docks.
I have posted the program on the website (www.able-ark.org). Login, click on "Information Library" page, and then click on Town Hall Meetings. You will see the "Dock Owners Meeting". You will need Adobe Acrobat in order to view the program.
Thanks for supporting ABLE!
Doug Timmons
President, ABLE
Telecom Board's recommendation to council doesn't please administration
Telecom Board's recommendation to council doesn't please administration
Friday, June 27, 2008
Petition to protect council-, citizen-initiated forums on government channel
PLEASE KEEP OUR LOCAL GOVERNMENT CHANNEL ISSUE FORUMS OPEN!
The City Administration recently cancelled issue forums about Fayetteville High School and Walton Arts Center, although the forums were requested by a City Council member. The City has arbitrarily decided that they will not allow such forums, although they have served our community for over 15 years. Please keep television Channel 16 open to requests by city council members and citizens, so that the channel can continue to help create an open and participatory city government, as called for in Fayetteville Ordinance 4504 and current Government Channel policy.
SIGN HERE TO ENSURE THAT OUR CITY COUNCIL MEMBERS AND ALL CITIZENS
CAN CONTINUE TO REQUEST LOCAL ISSUE FORUMS ON CITY 16 TV:
I, being a registered voter, living within the city limits of Fayetteville, ask that the Telecommunications Board and City Council continue the current policy and procedures of allowing City Council members and citizens to request forums, about issues faced by local governments, to be produced and shown on the Government Channel.
Printed Name Signature Address Telephone and/or E-mail¬¬¬¬¬
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Printed Name Signature Address Telephone and/or E-mail ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Printed Name Signature Address Telephone and/or E-mail _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Printed Name Signature Address Telephone and/or E-mail ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
The City Administration recently cancelled issue forums about Fayetteville High School and Walton Arts Center, although the forums were requested by a City Council member. The City has arbitrarily decided that they will not allow such forums, although they have served our community for over 15 years. Please keep television Channel 16 open to requests by city council members and citizens, so that the channel can continue to help create an open and participatory city government, as called for in Fayetteville Ordinance 4504 and current Government Channel policy.
SIGN HERE TO ENSURE THAT OUR CITY COUNCIL MEMBERS AND ALL CITIZENS
CAN CONTINUE TO REQUEST LOCAL ISSUE FORUMS ON CITY 16 TV:
I, being a registered voter, living within the city limits of Fayetteville, ask that the Telecommunications Board and City Council continue the current policy and procedures of allowing City Council members and citizens to request forums, about issues faced by local governments, to be produced and shown on the Government Channel.
Printed Name Signature Address Telephone and/or E-mail¬¬¬¬¬
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Printed Name Signature Address Telephone and/or E-mail ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Printed Name Signature Address Telephone and/or E-mail _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Printed Name Signature Address Telephone and/or E-mail ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Thursday, June 26, 2008
Wednesday, June 25, 2008
Jordan honored by Omni Center for Peace, Justice and Ecology
Sunday, June 15, 2008
Lioneld Jordan Honored by OMNI
Fayetteville City Council member Lioneld Jordan was recognized as a Nominee at OMNI's 2008 Peace & Justice Heroes Awards Banquet at St. Paul's Episcopal Church on June 14th. In announcing the awards, OMNI spokesperson Gladys Tiffany said, "The second nominee doesn’t need much introduction to Northwest Arkansas people. Lioneld Jordan has been a public servant in Fayetteville for many years, advancing the fundamental values of peace, justice, and ecology in our community.
"During his eight years on the City Council, Lioneld has supported the preservation of Mt. Sequoyah Woods and the Brooks-Hummell Natural Area, as well as the hillside-development ordinance. As chairman of the Street Committee, he took the leadership in advocating road-impact fees to address the effects of sprawl, has supported bikeway and trails as alternative systems, and led the effort to designate Martin Luther King, Jr. Boulevard.
"Lioneld has been a strong voice for social and economic justice. He has been a member of the advisory board of the Seven Hills Homeless Shelter and has worked to assure affordable housing in the city. As president of the Northwest Arkansas Labor Council, he has instituted the Citizen Leadership Academy to train advocates and give a voice to those less fortunate, and as former president of his local union, he initiated the monthly food drive, the campus-city street-trash pickup project, the community service awards, and the Christmas toy drive, while fighting for workers’ rights and job security.
"Thank you Lioneld for your years of service in Northwest Arkansas."
Lioneld Jordan Honored by OMNI
Fayetteville City Council member Lioneld Jordan was recognized as a Nominee at OMNI's 2008 Peace & Justice Heroes Awards Banquet at St. Paul's Episcopal Church on June 14th. In announcing the awards, OMNI spokesperson Gladys Tiffany said, "The second nominee doesn’t need much introduction to Northwest Arkansas people. Lioneld Jordan has been a public servant in Fayetteville for many years, advancing the fundamental values of peace, justice, and ecology in our community.
"During his eight years on the City Council, Lioneld has supported the preservation of Mt. Sequoyah Woods and the Brooks-Hummell Natural Area, as well as the hillside-development ordinance. As chairman of the Street Committee, he took the leadership in advocating road-impact fees to address the effects of sprawl, has supported bikeway and trails as alternative systems, and led the effort to designate Martin Luther King, Jr. Boulevard.
"Lioneld has been a strong voice for social and economic justice. He has been a member of the advisory board of the Seven Hills Homeless Shelter and has worked to assure affordable housing in the city. As president of the Northwest Arkansas Labor Council, he has instituted the Citizen Leadership Academy to train advocates and give a voice to those less fortunate, and as former president of his local union, he initiated the monthly food drive, the campus-city street-trash pickup project, the community service awards, and the Christmas toy drive, while fighting for workers’ rights and job security.
"Thank you Lioneld for your years of service in Northwest Arkansas."
Monday, June 23, 2008
Ozark Highlands Group of Sierra Club to meet with James Burke to discuss fight against dirty coal burning in Arkansas at Smiling Jack's at 7 p.m. Wed.
Our June monthly meeting will be this Wednesday at 7 p.m. at Smiling Jack's just off Dixon Street behind the Dixon Street book shop.
James Burke will be joining us to talk about the coal campaign and the progress we are making in that area. It will be very informal; this is a great opportunity to learn more about what we can do to make sure Arkansas doesn't build any new coal fired power plants. Bring your coal questions for James to answer!
Our Arkansas Chapter chair, Adrienne, will be bringing some yard signs protesting dirty coal if you would like one.
As always, please forward this email along to others you think might be interested.
Molly Rawn
Sierra Club, Ozark Headwaters Group
Intern
(479) 879-1620
James Burke will be joining us to talk about the coal campaign and the progress we are making in that area. It will be very informal; this is a great opportunity to learn more about what we can do to make sure Arkansas doesn't build any new coal fired power plants. Bring your coal questions for James to answer!
Our Arkansas Chapter chair, Adrienne, will be bringing some yard signs protesting dirty coal if you would like one.
As always, please forward this email along to others you think might be interested.
Molly Rawn
Sierra Club, Ozark Headwaters Group
Intern
(479) 879-1620
Sunday, June 22, 2008
Wetland article ignores drawbacks in wetland mitigation projects but provides valuable insight and source of hope for urban wetland protection
Woolsey wetland article in The Morning News
The Woolsey Prairie is adjacent to land where the new wastewater-treatment plant was built. Actually, the plant was built on what might be called the original Woolsey Prairie.
Because the plant destroyed a great many wetland acres, the Corps of Engineers permit required mitigation. There have been many shows on Government channel about the progress of creating the mitigation area over the past couple of years, mostly as a part of shows on progress of construction of the plant itself.
The good news is that the city is "manufacturing" wetland to make up for destruction. That isn't as good as preserving existing wetland exactly as nature made it. However, it is beautiful site.
The bad news is that a plan to allow developers to "purchase" shares in such mitigation land is similar to trading carbon-pollution rights. It means developers can dredge and fill to build on wetland in the city and "mitigate" it by paying for creation of such sites. This is better than nothing. However, it doesn't protect property from flooding downstream from the development. And it allows valuable habitat to be destroyed where it should be kept. It doesn't make stormwater remain where it falls and soak in to keep vegetation healthy and replenish underground aquifers.
That was the first story I ever read by Skip Descant. He appears to be a good reporter.
He wouldn't likely know about World Peace Wetland Prairie or that "keeping the water where it falls" is the contrasting idea that would have had to have been included in the story if his plan was to write a truly multi-source story.
In fact, WPWP is exactly opposite to a manufactured wetland area. It protects habitat and lets water soak in UPSTREAM where it falls. It was saved from development and stands in stark contrast with the Aspen Ridge/Hill Place development site to to its north.
While it has a large population of nonnative species, particularly fescue and Japanese honeysuckle that require constant volunteer effort to remove, it never had its basic seed and root base of native species removed.
Being inside the city and a part of the headwater system of the Town Branch of the West Fork of the White River and thus a significant area that helps protect the Beaver Lake watershed, its soil and plant life (even the invasive nonnative species) are functioning perfectly for stormwater management and protection of water quality.
The already completed Woolsey Prairie serves to catch water NEAR where it falls on the sewage-treatment plant. But adjacent parcels that may be saved as wetland prairie or savannah will be for sale to developers as mitigation for environmentally destruction parcels upstream. That part of the story has been discussed on several Government Channel productions related to the new sewage-treatment plant.
It would be nice to have a map of wetland areas. I frequently offer such information with photos from various parts of the watershed on my blogs and Flickr photo sets. But an overall plan to protect wetland isn't something everyone wants. Such a citywide delineation of wetland areas could prevent developers from buying property that should not be developed on the assumption that they will always get permission to dredge and fill such places simply by buying a share of an already preserved parcel miles away or not even in the same watershed.
Some developers and even some city officials and staff members don't want to acknowledge the existence of more than minimal wetland because public knowledge of the facts of Northwest Arkansas' environment might stifle their desire to build and pave every acre in the city.
More than two years ago, the Fayetteville Natural Heritage Association created a booklet with a list of environmentally sensitive areas in the city that the group deemed worthy of protection. That information has never been used by the city in any way, as far as I can tell. During the June 17, 2008, meeting of the Council of Neighborhoods, Bruce Shackleford's presentation on Woolsey Prairie got his ideas out to a lot of people and excited some of the neighborhood advocates to realize the importance of wetland prairie, exactly what we've been trying to do with our photos on Flickr and on our blogspots for the past year and for more than six years on Aubunique.com and for decades in various newspaper and magazine stories.
Fran Alexander and others persevere, but are only voices in the wildnerness, it seems.
Too many of the most outspoken people in the green, "sustainability" movement mostly focus on compromise positions. The paid environmentalists are all about compromise these days. Compromise mostly leads to learning to lose gracefully.
It takes people such as Fran Alexander with passion to get things done. And Shackleford's passion about the prairie wetland can do more to stir fervor in the fight to do the right thing in Fayetteville than some of us have done in decades. A lot of us old "tree-huggers" will be supporting his educational effort in every way we can.
For photos and more information, please use the following online links.
Hill Place/Aspen Ridge set of photos
Pinnacle Prairie set of photos — west side of World Peace Wetland Prairie
World Peace Wetland Prairie collection of sets of photos
Town Branch watershed set of photos
Thursday, June 19, 2008
Tuesday, June 17, 2008
Subscribe to:
Posts (Atom)





